Payment Terms | L/C,D/P,T/T |
Supply Ability | 60000ton/year |
Delivery Time | 8-10 work days |
Packaging Details | Naked |
Type | Truss bridge |
Application | Bailey Bridge |
Surface | Galvanized |
Name | Bailey Bridge |
Standard | ASTM, BS, GB |
Lane | Single lane 3.15m~4.2m,Double Lane 7.35m |
Surface Finish | Pained or Galvanized |
Secondary Steel | GB Q235 |
Net Width | 3.15m,3.6m,4.2m,7.35m,10.5m |
Brand Name | Zhonghai Bailey Bridge |
Model Number | CB200/CB321 |
Certification | IS09001, CE |
Place of Origin | China |
View Detail Information
Explore similar products
Prefabricated Compact Bailey Bridge / Portable Steel Bridge Light Weight
Q345E Bailey Steel Emergency Bridge TSR Structure Corrosion Resistance
galvanized Steel Emergency Panel Bridge Prefabricated Bailey Bridge
ISO9001 Steel Truss Bridges Galvanized Finish Grade 8.8 1m 1.2m 1.5m Footway
Product Specification
Payment Terms | L/C,D/P,T/T | Supply Ability | 60000ton/year |
Delivery Time | 8-10 work days | Packaging Details | Naked |
Type | Truss bridge | Application | Bailey Bridge |
Surface | Galvanized | Name | Bailey Bridge |
Standard | ASTM, BS, GB | Lane | Single lane 3.15m~4.2m,Double Lane 7.35m |
Surface Finish | Pained or Galvanized | Secondary Steel | GB Q235 |
Net Width | 3.15m,3.6m,4.2m,7.35m,10.5m | Brand Name | Zhonghai Bailey Bridge |
Model Number | CB200/CB321 | Certification | IS09001, CE |
Place of Origin | China | ||
High Light | compact panel bridge ,bailey truss bridge compact ,panel bridge iso9001 |
Triple Trusses Bailey Bridges/compact Panel Bridge
After a heavy rainstorm, Bailey bridges need to undergo a series of special inspections to ensure their safety and stability. The following are the inspection items that need to be focused on:
1. **Foundation inspection**
- **Inspect foundation settlement**: Heavy rain may cause uneven settlement of the foundation, especially the piers and abutments. Check whether the foundation has obvious sinking or tilting.
- **Inspect foundation stability**: Check whether there is water accumulation or hollowing caused by scouring around the foundation, and ensure that the foundation is firmly connected to the surrounding soil or structure.
2. **Bridge deck inspection**
- **Inspect bridge deck cracks**: Heavy rain may cause bridge decks to crack or deform, and the bridge decks need to be carefully inspected for new cracks, warping or displacement. If damaged, they should be replaced if necessary.
- **Inspect bridge deck drainage**: Ensure that the bridge deck drainage system is unobstructed to prevent water accumulation from further eroding the bridge deck.
3. **Structural inspection**
- **Inspect connectors**: Check whether the Bailey plate's connecting pins, bolts, beam clamps and other connectors are loose, detached or damaged. If it is loose, tighten or replace it in time.
- **Check the overall structural deformation**: Observe the overall shape of the bridge and check whether there is obvious deformation, twisting or tilting.
- **Check the wind-resistant tie rod**: Make sure the wind-resistant tie rod is firmly installed and not loose or damaged.
4. **Safety facility inspection**
- **Check the warning signs**: Check whether the warning signs at both ends of the bridge and on the bridge are complete and clear. If they are detached or damaged, they should be replenished and repaired in time.
- **Check the guardrail**: Check whether the guardrail is firm, whether it is damaged or deformed, and ensure that it can effectively prevent people and vehicles from falling.
5. **Drainage system inspection**
- **Check the drainage channel**: After the heavy rain, it is necessary to check whether the bridge deck drainage channel is unobstructed, clear the blockage in time, and prevent the accumulated water from further eroding the bridge foundation and structure.
6. **Other inspections**
- **Check the bridge deflection**: Use professional equipment to measure the mid-span deflection of the bridge to see if it has increased. Increased deflection may indicate that there are certain problems with the bridge structure, and further analysis of the cause and corresponding measures are needed.
- **Check the rust condition**: Heavy rain may cause the metal parts of the bridge to rust, which needs to be checked and anti-rust treatment is carried out in time.
Through the above inspections, the impact of heavy rain on Bailey bridges can be fully evaluated, potential safety hazards can be discovered and dealt with in time, and the safe use of the bridge can be ensured.
Specifications:
CB200 Truss Press Limited Table | |||||||||
NO. | Internal Force | Structure Form | |||||||
Not Reinforced Model | Reinforced Model | ||||||||
SS | DS | TS | QS | SSR | DSR | TSR | QSR | ||
200 | Standard Truss Moment(kN.m) | 1034.3 | 2027.2 | 2978.8 | 3930.3 | 2165.4 | 4244.2 | 6236.4 | 8228.6 |
200 | Standard Truss Shear (kN) | 222.1 | 435.3 | 639.6 | 843.9 | 222.1 | 435.3 | 639.6 | 843.9 |
201 | High Bending Truss Moment(kN.m) | 1593.2 | 3122.8 | 4585.5 | 6054.3 | 3335.8 | 6538.2 | 9607.1 | 12676.1 |
202 | High Bending Truss Shear(kN) | 348 | 696 | 1044 | 1392 | 348 | 696 | 1044 | 1392 |
203 | Shear Force of Super High Shear Truss(kN) | 509.8 | 999.2 | 1468.2 | 1937.2 | 509.8 | 999.2 | 1468.2 | 1937.2 |
CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge) | ||||
Structure | Geometric Characteristics | |||
Geometric Characteristics | Chord Area(cm2) | Section Properties(cm3) | Moment of Inertia(cm4) | |
ss | SS | 25.48 | 5437 | 580174 |
SSR | 50.96 | 10875 | 1160348 | |
DS | DS | 50.96 | 10875 | 1160348 |
DSR1 | 76.44 | 16312 | 1740522 | |
DSR2 | 101.92 | 21750 | 2320696 | |
TS | TS | 76.44 | 16312 | 1740522 |
TSR2 | 127.4 | 27185 | 2900870 | |
TSR3 | 152.88 | 32625 | 3481044 | |
QS | QS | 101.92 | 21750 | 2320696 |
QSR3 | 178.36 | 38059 | 4061218 | |
QSR4 | 203.84 | 43500 | 4641392 |
CB321(100) Truss Press Limited Table | |||||||||
No. | Lnternal Force | Structure Form | |||||||
Not Reinforced Model | Reinforced Model | ||||||||
SS | DS | TS | DDR | SSR | DSR | TSR | DDR | ||
321(100) | Standard Truss Moment(kN.m) | 788.2 | 1576.4 | 2246.4 | 3265.4 | 1687.5 | 3375 | 4809.4 | 6750 |
321(100) | Standard Truss Shear (kN) | 245.2 | 490.5 | 698.9 | 490.5 | 245.2 | 490.5 | 698.9 | 490.5 |
321 (100) Table of geometric characteristics of truss bridge(Half bridge) | |||||||||
Type No. | Geometric Characteristics | Structure Form | |||||||
Not Reinforced Model | Reinforced Model | ||||||||
SS | DS | TS | DDR | SSR | DSR | TSR | DDR | ||
321(100) | Section properties(cm3) | 3578.5 | 7157.1 | 10735.6 | 14817.9 | 7699.1 | 15398.3 | 23097.4 | 30641.7 |
321(100) | Moment of inertia(cm4) | 250497.2 | 500994.4 | 751491.6 | 2148588.8 | 577434.4 | 1154868.8 | 1732303.2 | 4596255.2 |
Advantage
Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity
Company Details
Business Type:
Manufacturer
Year Established:
2014
Total Annual:
20753202.90-27670940.00
Employee Number:
100~150
Ecer Certification:
Verified Supplier
Introduction to Jiangsu Zhonghai Bridge Equipment Co., Ltd. Jiangsu Zhonghai Bridge Equipment Co., Ltd., established in 2010, is a high-tech enterprise specializing in the research, development, manufacturing, and sales of bridge equipment. With a registered capital of 55 million yuan, the company ... Introduction to Jiangsu Zhonghai Bridge Equipment Co., Ltd. Jiangsu Zhonghai Bridge Equipment Co., Ltd., established in 2010, is a high-tech enterprise specializing in the research, development, manufacturing, and sales of bridge equipment. With a registered capital of 55 million yuan, the company ...
Get in touch with us
Leave a Message, we will call you back quickly!