Payment Terms | T/T |
Supply Ability | 1 set 3 weeks |
Delivery Time | 3-5 weeks |
Packaging Details | Wooden Box |
Name | Wireline Wellhead Adapter |
Connection Type | O&B |
ID | 2"~7" |
Function | allows for only the joint that was broken to be tested, without filling the whole lubricator system |
Work Pressure | 3k 5k 10k 15k |
Material | Alloy Steel&Nickel Alloy |
Service | Standard&H2S |
Brand Name | Ruixin |
Model Number | 2inch ID 2.5inch ID 3inch ID 4.06inch ID 5-1/8inch ID |
Certification | API |
Place of Origin | China Baoji |
View Detail Information
Explore similar products
Steel Pressure Control Slickline Stuffing Box 16 Inch
8 Inch Wireline Torsion Tester For Torsion Experiment Instrument
Pump In Tee Wireline Pressure Control Equipment API Standard
4ft 6ft 8ft Lightweight Lubricator Wireline And Slickline Tools
Product Specification
Payment Terms | T/T | Supply Ability | 1 set 3 weeks |
Delivery Time | 3-5 weeks | Packaging Details | Wooden Box |
Name | Wireline Wellhead Adapter | Connection Type | O&B |
ID | 2"~7" | Function | allows for only the joint that was broken to be tested, without filling the whole lubricator system |
Work Pressure | 3k 5k 10k 15k | Material | Alloy Steel&Nickel Alloy |
Service | Standard&H2S | Brand Name | Ruixin |
Model Number | 2inch ID 2.5inch ID 3inch ID 4.06inch ID 5-1/8inch ID | Certification | API |
Place of Origin | China Baoji | ||
High Light | wellhead adapter ,Wireline tree cap ,Wireline Wellhead Adapter |
Wireline Wellhead Adapter Slickline Pressure Control Equipment
I. Introduction
The Wellhead Adapter is used to connect the blowout preventer and the wellhead, the upper part of which is connected to the blowout preventer, and the lower part is connected to the wellhead.
Wellhead Adapter are sealed by threads. When in use, wrap the thread with PTFE tape or apply anti-sticking grease on the thread, and then directly tighten the Wellhead Adapter on the thread of the wellhead.
II. Pressure test:
The Wellhead Adapter shall be tested for compressive strength regularly, and the test pressure shall be 1.5 times the working pressure.
1. Install the pressure test connector and connect the pressure test pipeline;
2. Start the pressure test pump for pressure test: press to the test pressure, keep the pressure for 15 minutes without leakage, and fill in the test record card.
III. Daily maintenance:
1. Pressure test should be carried out regularly;
2. When not in use temporarily, you should bring the protective wire for storage.
Welcome to contact us at any time.
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2012
Total Annual:
200-500
Employee Number:
One~Fifty
Ecer Certification:
Verified Supplier
Ruixin Energy Equipment Ruixin Energy Equipment is slickline manufacturer focused on wireline PCE , wireline tools, coiled tubing tools, etc.. Our factory and technology R & D center is Located in the national technology enterprise incubation industry park - 401B, High-... Ruixin Energy Equipment Ruixin Energy Equipment is slickline manufacturer focused on wireline PCE , wireline tools, coiled tubing tools, etc.. Our factory and technology R & D center is Located in the national technology enterprise incubation industry park - 401B, High-...
Get in touch with us
Leave a Message, we will call you back quickly!