Payment Terms | According to detailed order |
Delivery Time | negotiation |
Packaging Details | According to detailed order |
Material | steel\iron bridge |
Capacity | tracked load 60t |
Structure | Simple structure |
name | Military Bridge |
bridge length | 21-24M |
Product name | Erection Time 10min Max. Speed 85km/H Military Mobile Bridge |
Type | Heavy |
Color | Clients' Requirments |
Brand Name | Harzone |
Place of Origin | China |
Certification | ISO |
View Detail Information
Explore similar products
51m Large - Span Mechanized Bridge / Emergency Bridge With Flexibility, Simple
Flexibility 51m Large - Span Mechanized / Emergency Bridges / Single Suspension
Automatic Single Span Deck Heavy Mechanized Bridge For Temporary Transportation
15m Span Heavy Mechanized Bridge With Advanced Engine, Gearbox For Dry Gaps and
Product Specification
Payment Terms | According to detailed order | Delivery Time | negotiation |
Packaging Details | According to detailed order | Material | steel\iron bridge |
Capacity | tracked load 60t | Structure | Simple structure |
name | Military Bridge | bridge length | 21-24M |
Product name | Erection Time 10min Max. Speed 85km/H Military Mobile Bridge | Type | Heavy |
Color | Clients' Requirments | Brand Name | Harzone |
Place of Origin | China | Certification | ISO |
High Light | 10min Military Mobile Bridge ,85km/H Military Mobile Bridge ,85km/H army mobile bridge |
Erection Time 10min Max. Speed 85km/H Military Mobile Bridge
1. Introduction of Erection Time 10min Max. Speed 85km/H Military Mobile Bridge
A set of Erection Time 10min Max. Speed 85km/H Military Mobile Bridge carried by vehicle, accomplishing bridge erection and retrieval by itself.
2. Usage of Erection Time 10min Max. Speed 85km/H Military Mobile Bridge
Erection Time 10min Max. Speed 85km/H Military Mobile Bridge main used as 3.3m wide,24m or 21m long temporary channels for overcoming small river, dry gap and craters, ensure all sorts of vehicles with a tracked load of up to 60 tons or an axle load of up to 13 tons to go across.
3. Basic composition of Erection Time 10min Max. Speed 85km/H Military Mobile Bridge
Erection Time 10min Max. Speed 85km/H Military Mobile Bridge is mainly composed of auxiliary, span and chassis equipment. The brdige is folded on the chassis when transportation and erected by chassis. The auxiliary equipment is used to help with erecting and fixing.
4. Main Features of Erection Time 10min Max. Speed 85km/H Military Mobile Bridge
No | Item | Data |
1 | Total weight | ≤32t |
2 | Outline dimension (L×W×H) | 13m×3.32m×3.6m |
3 | Load capacity | |
Tracked Load | 60t | |
Wheeled Load | 17t | |
4 | Span weight | 10.5t |
5 | Bridge length | 21m |
6 | Erection time | 10min |
7 | Retrieval time | 10min |
8 | Max. longitudinal slope | ±10% |
9 | Max. lateral slope | ±5% |
10 | Allowed bank differences | ±2.0m |
11 | Operators | 2~3 |
12 | Max. speed | 85 km/h |
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
1967
Total Annual:
200 Million USD-205 Million
Employee Number:
2000~2000
Ecer Certification:
Verified Supplier
China Harzone Industry Corp., Ltd. ,built in 1967, is the subsidiary of China State Shipbuilding Corporation Limited(CSSC) and one military enterprise whose conservation was given priority status in China. Harzone Industry has the qualification of design, manufacturing and installing ... China Harzone Industry Corp., Ltd. ,built in 1967, is the subsidiary of China State Shipbuilding Corporation Limited(CSSC) and one military enterprise whose conservation was given priority status in China. Harzone Industry has the qualification of design, manufacturing and installing ...
Get in touch with us
Leave a Message, we will call you back quickly!