Payment Terms | According to detailed order |
Delivery Time | negotiation |
Packaging Details | According to detailed order |
Product Name | 21m Mechanized bridge |
Material | Iron |
Feature | Reusable Brigde |
Status | Sefl Fold and Unfold |
High loading capacity | Tracked load-60t, wheeled load-13t |
Usage | overcoming dry gaps |
Brand Name | Harzone |
Place of Origin | China |
View Detail Information
Explore similar products
51m Large - Span Mechanized Bridge / Emergency Bridge With Flexibility, Simple
Flexibility 51m Large - Span Mechanized / Emergency Bridges / Single Suspension
Automatic Single Span Deck Heavy Mechanized Bridge For Temporary Transportation
15m Span Heavy Mechanized Bridge With Advanced Engine, Gearbox For Dry Gaps and
Product Specification
Payment Terms | According to detailed order | Delivery Time | negotiation |
Packaging Details | According to detailed order | Product Name | 21m Mechanized bridge |
Material | Iron | Feature | Reusable Brigde |
Status | Sefl Fold and Unfold | High loading capacity | Tracked load-60t, wheeled load-13t |
Usage | overcoming dry gaps | Brand Name | Harzone |
Place of Origin | China | ||
High Light | 21m emergency bridge ,fast erection emergency bridge ,accident emergency bridge |
21m Fast Erection Emergency Bridge For Accident / Mechanized Bridge
Introduction of Mechanized Bridge
21m Mechanized Bridge is a set of mechanized bridge equipment carried by vehicle, accomplishing bridge erection and retrieval by itself.
Main Features of Mechanized Bridge
Excellent cross country performance | using 8×8 military cross country chassis |
Fast erection | 10min |
Less operators | 2-3 |
High loading capacity | Tracked load-60t, wheeled load-13t |
Usage of Mechanized Bridge
21m Mechanized Bridge is main used as 3.3m wide,21m/24m long temporary bridge for overcoming dry gaps,small medium rivers and craters, ensure all sorts of castles with an axle load of up to 13 tons or a tracked load of up to 60 tons to go across rapidly.
Basic composition of Mechanized Bridge
The span is folded on the chassis when transportation and erected by chassis. The auxiliary equipment is used to help with erecting and fixing.It is mainly composed of chassis,span and auxiliary equipment.
Mechanized Bridge Picture
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
1967
Total Annual:
200 Million USD-205 Million
Employee Number:
2000~2000
Ecer Certification:
Verified Supplier
China Harzone Industry Corp., Ltd. ,built in 1967, is the subsidiary of China State Shipbuilding Corporation Limited(CSSC) and one military enterprise whose conservation was given priority status in China. Harzone Industry has the qualification of design, manufacturing and installing ... China Harzone Industry Corp., Ltd. ,built in 1967, is the subsidiary of China State Shipbuilding Corporation Limited(CSSC) and one military enterprise whose conservation was given priority status in China. Harzone Industry has the qualification of design, manufacturing and installing ...
Get in touch with us
Leave a Message, we will call you back quickly!