Payment Terms | L/C, T/T |
Supply Ability | 50 PCS PER MONTH |
Delivery Time | 35 working days |
Packaging Details | Wooden case |
Name | Pick and place machine |
Module | HT-T9 |
Capacity | 200000-250000 cph |
PCB Length | any length |
Warranty | 1 year |
Feeding way | Electric feeder with double motor |
Brand Name | ETON |
Model Number | HT-T9 |
Certification | CCC |
Place of Origin | China |
View Detail Information
Explore similar products
Middle Speed SMT Surface Mount Machine HT-E8S High Precision Good Stability
Electric Board SMT pick and place machine HT-E5 For LED light power driver
8 Heads ETON PCB pick and place machine E6T Economy Middle Speed
Fast Speed LED Tube Light Making Machine Adjustable Pneumatic 1530MM Height
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 50 PCS PER MONTH |
Delivery Time | 35 working days | Packaging Details | Wooden case |
Name | Pick and place machine | Module | HT-T9 |
Capacity | 200000-250000 cph | PCB Length | any length |
Warranty | 1 year | Feeding way | Electric feeder with double motor |
Brand Name | ETON | Model Number | HT-T9 |
Certification | CCC | Place of Origin | China |
High Light | 200000cph Led Pick And Place Machine ,CCC Led Pick And Place Machine ,32 Nozzles Led Strip Chip Mounter |
Automated pick and place machine for led strip light
The specific production process is as follows:
After the solder paste is warmed up, stir it, and then put a small amount on the stencil of the printing machine. The amount should be 3/2 of the solder paste when the squeegee advances. After the first trial printing, pay attention to whether the solder paste at the LED pad position on the FPC is full, whether there is less or more tin, and whether there is a short circuit. This check is very critical, and if the check is not strict, it will cause poor quality later.
The program of the placement machine is pre-programmed. As long as there is no problem with the first board placement, the subsequent production will be stable. What needs to be noted here is that the polarity of the LED and the resistance value of the chip resistor should not be confused. Another thing to note is that the mounting position should not be shifted.
Need to pay attention to check the polarity of the LED on the LED strip (whether it is reversed), whether the mounting is offset, whether there is a short circuit, whether the resistance value is correct, etc.
It should be noted here that the reflow temperature must be controlled well. If it is too low, the solder paste will not melt, and cold soldering will occur; if it is too high, FPC will easily foam. Also, the preheating temperature should be appropriate. Too low the flux will not evaporate completely, and there will be residues after reflow, which will affect the appearance; too high will cause the flux to evaporate prematurely, resulting in false soldering during reflow, and may produce tin Beads.
Here you need to check the appearance of the product to see if there is any soldering defects, solder balls, short circuits, etc. Then there is electrical inspection to test whether the electrical performance of the product is intact and whether the parameters are correct.
Among the materials used for waterproof light bars, epoxy resin AB glue and PU polyurethane are more commonly used in the market.
7. Testing, aging, and packaging finished products!
The packaging of LED strips is generally 5 meters per roll, and is packed in anti-static and moisture-proof packaging bags.
Led making machine parameter
Length*Width*Height | 3100*2300*1550 mm |
PCB Length Width | 250mm*any length |
Mounting speed | 200000-250000 cph |
Mounting element height | No more than 5mm |
No.of Feeders Station | 68 pcs |
No. of Nozzles | 68 pcs |
Power consumption | 380 AC 50HZ |
Feeding way | Electric feeder with double motor |
Service
Much experience and professional for led lighting production line. We can give the professional suggestion and training for you.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2007
Total Annual:
300000000-50000000
Employee Number:
300~500
Ecer Certification:
Site Member
Shenzhen ETON Automation Equipment Co.,LTD. was establised in 2007,possess more than 300 staff at present and cover an area of more than 20000 square meters,is the largest leading manufacturer of high-speed pick and place machine and SMT machine for LED light production and Electronic field,whic... Shenzhen ETON Automation Equipment Co.,LTD. was establised in 2007,possess more than 300 staff at present and cover an area of more than 20000 square meters,is the largest leading manufacturer of high-speed pick and place machine and SMT machine for LED light production and Electronic field,whic...
Get in touch with us
Leave a Message, we will call you back quickly!