Packaging Details | FR or Bulk Ship |
Delivery Time | 45 working days |
Payment Terms | T/T, L/C |
Supply Ability | 120 units per year |
Min.Operating Width | 5m |
Max.Operating Width | 25m |
Maximum Load-bearing Capacity of The Main Arm | 3000Kg |
Maximum Load-bearing Capacity of The Auxiliary Arm | 1500Kg |
Transportation Dimension (L X W X H) | 9200×2600×3500mm |
Model | Arch Installation Robot KGM12300CSG |
Ground Cleareace | 450mm |
Dual Power | Diesel & Electric |
Brand Name | POTENTIAL / POTENCY |
Model Number | KGM12300CSG |
Place of Origin | CHINA |
Certification | ISO9001:2015 |
View Detail Information
Explore similar products
Dual Power Diesel Electric Arch Installation Trolley for KGJ312 Robot
KGJ312 Arch Installation Trolley 3000Kg Load Capacity 12m Height
High Load Capacity Arch Installation Cart KGJ312 - 1500Kg Load, 12m Height
Dual Power Arch Installation Trolley KGJ312 with 3 Booms for Tunnel Construction
Product Specification
Packaging Details | FR or Bulk Ship | Delivery Time | 45 working days |
Payment Terms | T/T, L/C | Supply Ability | 120 units per year |
Min.Operating Width | 5m | Max.Operating Width | 25m |
Maximum Load-bearing Capacity of The Main Arm | 3000Kg | Maximum Load-bearing Capacity of The Auxiliary Arm | 1500Kg |
Transportation Dimension (L X W X H) | 9200×2600×3500mm | Model | Arch Installation Robot KGM12300CSG |
Ground Cleareace | 450mm | Dual Power | Diesel & Electric |
Brand Name | POTENTIAL / POTENCY | Model Number | KGM12300CSG |
Place of Origin | CHINA | Certification | ISO9001:2015 |
High Light | Dual power arch installation trolley ,1500kg auxiliary arm trolley ,Heavy-duty arch installation trolley |
Dual Power Arch Installation Trolley Maximum Load-bearing Capacity of The Auxiliary Arm 1500Kg for Construction Projects
Adopting a hybrid design of diesel and electric power, the diesel engine provides high-intensity operation power in the tunnel (according to the National III emission standard), while the electric motor (IE3 high-efficiency three-phase asynchronous) meets the construction needs of urban areas or enclosed spaces with low noise and zero emissions. The power switching response time is less than 30 seconds.
The dual power redundancy design ensures that the equipment can maintain 50% of its basic operational capacity in the event of a single system failure, significantly improving the continuity of tunnel construction.
By using turbocharging matching and ECU high-altitude calibration technology, the rated power output can be maintained at an altitude of 4500 meters and in extreme environments ranging from -25 ℃ to 50 ℃, with a power attenuation rate of less than 8% (industry average of 15%).
The hydraulic system is equipped with a constant power control and oil temperature adaptive adjustment module to solve the problem of starting at low temperatures on high altitudes.
Full coverage capability of construction methods. Unique folding+telescopic three arm structure, supporting synchronous construction of full section/two step/three step, with a maximum of 6 high-speed railway double track tunnel arches installed per shift (3 traditional equipment). The 7-degree-of-freedom robotic arm is equipped with a millimeter level laser positioning system, and the arch docking error is controlled within ± 3mm.
Intelligent homework system. Integrate CAN bus control system to achieve pre programming of arm movement trajectory, collision warning, and automatic obstacle avoidance functions. The remote monitoring platform can view equipment operating parameters in real time, generate 3D construction logs, and support big data analysis of over excavation and under excavation.
Multi protection system. The patented folding protective shield (CN222879688U) can be unfolded within 0.5 seconds to form a 2.5m ² anti rockfall area. Mechanical arm hydraulic locking+electrical interlock dual safety, preventing fixture failure caused by sudden oil pipe rupture.
Human Machine Engineering Optimization. Wireless remote control with a radius of up to 50 meters allows operators to stay away from dangerous areas on the palm face. The centralized lubrication system reduces maintenance time by 60% and is equipped with a high-altitude oxygen cabin type cab.
Realize continuous operation at an altitude of 4300 meters in the Sichuan Tibet Railway project. The monthly arch installation progress is 15% ahead of schedule.
The power mode is applied to the construction of Shenzhen Metro Line 14. Noise control is maintained below 65dB, meeting the environmental protection requirements for nighttime construction.
In the 2024 Gansu tunnel collapse accident, the dual power system ensures 72 hours of uninterrupted support operation.
Attribute | Value |
---|---|
Dual Power | Diesel & Electric |
Transportation Dimension (L X W X H) | 9200×2600×3500mm |
Model | Arch Installation Robot KGM12300CSG |
Maximum Load-bearing Capacity of The Auxiliary Arm | 1500Kg |
Max. Operating Width | 25m |
Ground Clearance | 450mm |
Min. Operating Width | 5m |
Maximum Load-bearing Capacity of The Main Arm | 3000Kg |
POTENTIAL / POTENCY's Arch Installation Trolley, model number KGM12300CSG, is a versatile and robust equipment designed for various Product Application Occasions and Scenarios. Manufactured in CHINA, this product is certified with ISO9001:2015, ensuring high quality and performance.
With a Minimum Order Quantity of 1 unit and negotiable pricing, the Arch Installation Trolley is suitable for a wide range of applications. Whether it is used as an Arch Assembly Robot for Tunnel construction, Arch Installation Carrier for large infrastructure projects, or a reliable Arch Installation Trolley for industrial settings, this equipment offers exceptional functionality and efficiency.
The Packaging Details for this product include options for FR or Bulk Ship, providing flexibility in delivery methods. Customers can expect a Delivery Time of 45 working days, along with convenient Payment Terms such as T/T and L/C.
With a Supply Ability of 120 units per year, the Arch Installation Trolley is readily available to meet the demands of various projects. It boasts impressive features such as a Max. Operating Width of 25m, Maximum Load-bearing Capacity of the Auxiliary Arm at 1500Kg, and Dual Power options of Diesel & Electric for added versatility.
Moreover, the Arch Installation Trolley offers a Maximum Load-bearing Capacity of the Main Arm at 3000Kg, ensuring it can handle heavy loads with ease. The equipment is designed with a Ground Clearance of 450mm, allowing for smooth navigation even in challenging terrains.
Customize your Arch Assembly Robot for Tunnel with our Product Customization Services:
- Brand Name: POTENTIAL / POTENCY
- Model Number: KGM12300CSG
- Place of Origin: CHINA
- Certification: ISO9001:2015
- Minimum Order Quantity: 1 Unit
- Price: Negotiable
- Packaging Details: FR or Bulk Ship
- Delivery Time: 45 working days
- Payment Terms: T/T, L/C
- Supply Ability: 120 units per year
- Transportation Dimension (L X W X H): 9200×2600×3500mm
- Dual Power: Diesel & Electric
- Maximum Load-bearing Capacity of The Main Arm: 3000Kg
- Max. Operating Width: 25m
- Min. Operating Width: 5m
Product Packaging:
The Arch Installation Trolley is carefully packaged in a sturdy cardboard box to ensure safe delivery. The product is securely wrapped in bubble wrap to prevent any damage during transportation.
Shipping:
We offer free shipping for the Arch Installation Trolley within the contiguous United States. For international orders, shipping charges will apply based on the destination country. Orders are typically processed and shipped within 1-2 business days. Customers will receive a tracking number to monitor the status of their delivery.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1992
Total Annual:
15000000-50000000
Employee Number:
300~500
Ecer Certification:
Verified Supplier
Our factory was founded in the early 1990s with a registered capital of 60 million yuan, we are a high-tech enterprise specializing in the research and development, design, manufacturing, sales, and leasing of tunnel & mining intelligent equipment and construction machinery as well. ... Our factory was founded in the early 1990s with a registered capital of 60 million yuan, we are a high-tech enterprise specializing in the research and development, design, manufacturing, sales, and leasing of tunnel & mining intelligent equipment and construction machinery as well. ...
Get in touch with us
Leave a Message, we will call you back quickly!