Payment Terms | L/C,T/T,Western Union,MoneyGram |
Supply Ability | 30 unit/year |
Delivery Time | 60DAYS |
Packaging Details | standard Package |
Capability | 3-4unit/H |
Foaming Thickness | 30-100mm |
Cleaning Level | SA2.5 |
Brand Name | huashida |
Model Number | Preinsulated pipe 508-1620 |
Certification | CE |
Place of Origin | QINGDAO,CHINA |
View Detail Information
Explore similar products
Polyurethane Spraying Foam Pre Insulated Steel Pipe Making Machine PLC Control
380V/50Hz Spray Polyethylene Winding Insulation Pipe Production Line 20-1600mm
Polyurethane Foam Coating Insulation Pipe Making Machine For Hot / Cold Pipline
Polyurethane Spraying Foam HDPE Winding Protective Jacket Pre insulated Steel
Product Specification
Payment Terms | L/C,T/T,Western Union,MoneyGram | Supply Ability | 30 unit/year |
Delivery Time | 60DAYS | Packaging Details | standard Package |
Capability | 3-4unit/H | Foaming Thickness | 30-100mm |
Cleaning Level | SA2.5 | Brand Name | huashida |
Model Number | Preinsulated pipe 508-1620 | Certification | CE |
Place of Origin | QINGDAO,CHINA | ||
High Light | Polyurethane Spraying Foam Preinsulated Steel Pipe Machine ,Polyurethane Insulation Pipe Machine ,Polyurethane Foam Pre-Insulated Pipe Production Line |
Huashida Rigid polyurethane spraying polyethylene winding prefabricated directly buried insulation pipe consists of steel working pipe, spraying polyurethane rigid foam insulation layer and winding polyethylene outer protective pipe.
The line adopts continuous spraying production process.It features a high degree of automation, fast production efficiency, raw material saving, increased foaming and closed-cell rate, reduced water absorption rate, and three-in-one molding, making its performance more reliable. Low-carbon and environmentally friendly products have high economic and social benefits.
The production line is composed of three major parts:
√ Steel Pipe Shot Blasting Machine
√ Polyurethane Spraying Production Line
√ PE Outer Jacket Winding Production Line
Application scenario:
Mainly used for the production of thermal insulation pipes for heating, cooling, petroleum, chemical and other fields.
Production steps:
1. Remove rust from steel pipe surface
2. preheat the steel pipe to get it ready for polyurethane spraying
3. Spray polyurethane evenly on steel pipe outer surface
4. Wrap melted HDPE strap around the PU foam
5. Trim the pipe ends
Production line parameter:
1.Steel pipe range: 206mm-1820mm
2.Processing capacity:≤250m2/h
3. Cleaning class: Sa2.5
4.Used material: ISO (isocyanate), POLY (premixed polyether polyols), PE
5.Main equipment: Shot blasting and rust removal production line, Polyurethane spray production line, PE winding production line.
Steel Pipe Diameter (mm) | Insulation Thickness (mm) | Outer Jacket Diameter (mm) | Minimum Outer Jacket Wall Thickness (mm) |
---|---|---|---|
500 | 30-60 | 580-640 | 5.6 |
630 | 30-60 | 710-772 | 6.6 |
710 | 30-60 | 790-850 | 7.2 |
800 | 30-60 | 885-950 | 7.9 |
900 | 30-60 | 980-1054 | 8.7 |
1000 | 30-60 | 1090-1155 | 9.4 |
1100 | 30-60 | 1190-1250 | 10.2 |
1200 | 40-100 | 1316-1436 | 11 |
1400 | 50-100 | 1538-1638 | 12.5 |
1500 | 50-100 | 1638-1738 | 12.5 |
Company Details
Business Type:
Manufacturer
Year Established:
2003
Total Annual:
3000000-5000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
1. company profileQingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe joints a... 1. company profileQingdao Huashida Machinery Co., Ltd. is located in Qingdao High & New Technology Industrial Area- Qingdao Huashida industrial Park, covers an area of about 4000 square meters. We have tens of years experience in plastic pipe, sheet, and board extrusion lines, and pipe joints a...
Get in touch with us
Leave a Message, we will call you back quickly!