Payment Terms | T/T |
Supply Ability | 50 Sets Mould Per Month |
Delivery Time | 30 working days |
Packaging Details | Wooden Case With Steel Frame |
Mold type | 2 plate-mold |
Part material | PBT+15%GF V0 Fireproof Resin |
Mold material | 718/738/NAK80/S136 |
Mold base material | S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base |
Cavity number | Single cavity |
Mold life | 500000 shots |
Brand Name | KYE |
Model Number | OEM |
Certification | ISO9001:ISO14001 |
Place of Origin | China |
View Detail Information
Explore similar products
V0 PC Fire Protection Cold Runner OEM DMEElectronic injection Mould
Fan Blade Vo Fire Protection PP 3 Plate LKM S50C Electronic Injection Mold
2 Plate NAK80 DME HASCO Hot Runner Injection Mould
Cold Runner S136 718H Electronic Injection Mold For Socket Base
Product Specification
Payment Terms | T/T | Supply Ability | 50 Sets Mould Per Month |
Delivery Time | 30 working days | Packaging Details | Wooden Case With Steel Frame |
Mold type | 2 plate-mold | Part material | PBT+15%GF V0 Fireproof Resin |
Mold material | 718/738/NAK80/S136 | Mold base material | S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base |
Cavity number | Single cavity | Mold life | 500000 shots |
Brand Name | KYE | Model Number | OEM |
Certification | ISO9001:ISO14001 | Place of Origin | China |
High Light | DAIDO Electronic Injection Mold ,NAK80 DAIDO Electronic Mold ,0.005mm Tolerance Electronic Mold |
0.005mm Tolerance NAK80 DAIDO Electronic Injection Mold
Product Details Description
Mold material | H13, 2344, P20, 2311, Starvax 420, 236,S136, 2312, 2379, 2316, 2083, Nak80, 2767 ...etc. |
Mold base | LKM, FUTA, HASCO, DME,...etc. Or as per Customer's Requirment. |
Part Material | PS, ABS, PP, PVC, PMMA, PBT, PC, POM, PA66, PA6, PBT+GF, PC/ABS, PEEK, HDPE, TPU, PET, PPO,...etc. |
Cavity number | Single-cavity or Multi-cavit,as per customers requirement and part structure. |
Mold Life | 300,000 shots,500,000shots ,1,000,000 shots . |
Runner | Hot runner, Cold runner, as per customers requirement and part structure. |
Software | UG,Proe,Solidworks,AutoCad,etc. |
Lead time | T1,4-5 weeks after the mold 3D approved |
Package | Standard exported Wooden box packed, Fumigation process(upon required) |
Equipments | CNC, EDM, precision grinder,milling machine,driller,wire cutting machine,etc |
KYE team is at your service offering professional expertise, flexibility and accuracy in assumed deadlines.We are able to offer the full range of service from mold designing, Engineering/ Technical,Mold Building,Technical Injection Molding and Plasting/die-casting molding, plastic part molding to printing, assembly, package, and shipping arrangement.
We help you realize an idea to real product.
- Product idea viability check
- Product engineering verification
- Engineering design
- Prototype
- Tooling and molding
- Order production
- Assembly and packaging
- Logistics and shipping
OUR ADVANTAGE
FAQ
Q: What is your monthly capacity of mold making?
Our capability is 30 sets-50 sets molds one month,however, it depends of different products.
Q. What's your mold tolerance?
A. 0.005-0.02mm according to different product requirements.
Q. What I should offer to you if I need a quote?
A. 2D product drawing & 3D File, or send us real plastic sample.
Q. Which material will your factory use to make a mold?
A. Our regular material has NAK80, S136, LKM, DAIDO, HASCO, DME
Q. What's your delivery time for molds and plastic injection products?
A. Our delivery time for mold: 3-5 weeks as mold structure complexity.
Plastic injection products: 3-18 days.
Q. What we need to provide if we want to start cooperation?
A. 1. 3D file or Real sample for your products;
2. Material you require;
3. Surface treatment requirement
KYE team is at your service offering professional expertise, flexibility and accuracy in assumed deadlines.We are able to offer the full range of service from mold designing, making, plastic part molding to printing, assembly, package, and shipping arrangementWelcome your visit and looking for your inquiry.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter
Year Established:
2008
Total Annual:
2 Million-3 Million
Employee Number:
50~80
Ecer Certification:
Site Member
KYE Mould Technology Limited is set up at 2009, located in the well-known industrial town Chang`An,Dongguan city of China with convenient transportation and booming economy. We provide customer with one–stop service including product design,mold fabrication and second-processing(spray painting... KYE Mould Technology Limited is set up at 2009, located in the well-known industrial town Chang`An,Dongguan city of China with convenient transportation and booming economy. We provide customer with one–stop service including product design,mold fabrication and second-processing(spray painting...
Get in touch with us
Leave a Message, we will call you back quickly!