China factories

China factory - Shanghai Yekun Construction Machinery Co., Ltd.

Shanghai Yekun Construction Machinery Co., Ltd.

  • China,Shanghai ,Shanghai
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Jetties Water Driven Hydraulic Pile Driver , Excavator Sheet Pile Driver
China Jetties Water Driven Hydraulic Pile Driver , Excavator Sheet Pile Driver

  1. China Jetties Water Driven Hydraulic Pile Driver , Excavator Sheet Pile Driver
  2. China Jetties Water Driven Hydraulic Pile Driver , Excavator Sheet Pile Driver
  3. China Jetties Water Driven Hydraulic Pile Driver , Excavator Sheet Pile Driver
  4. China Jetties Water Driven Hydraulic Pile Driver , Excavator Sheet Pile Driver

Jetties Water Driven Hydraulic Pile Driver , Excavator Sheet Pile Driver

  1. MOQ: 1 set
  2. Price: Negotiation
  3. Get Latest Price
Payment Terms T/T, D/P, Western Union, MoneyGram
Supply Ability 15 set/month
Delivery Time 10-35 days
Packaging Details 5.824 CBM
Name Hydraulic Sheet Pile Driver
Feature Water Driven Capability
Operation Pressure 30 Mpa
Arm Weight 500 kg
Hammer Weight 1700 kg
Vibration Frequency 3200 rpm
Excavator 20-30 Ton
Max. Pile Length 10 m
Centrifugal Force 265 Kn
Brand Name VIBRA
Model Number FV-250
Place of Origin SHANGHAI

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, D/P, Western Union, MoneyGram Supply Ability 15 set/month
Delivery Time 10-35 days Packaging Details 5.824 CBM
Name Hydraulic Sheet Pile Driver Feature Water Driven Capability
Operation Pressure 30 Mpa Arm Weight 500 kg
Hammer Weight 1700 kg Vibration Frequency 3200 rpm
Excavator 20-30 Ton Max. Pile Length 10 m
Centrifugal Force 265 Kn Brand Name VIBRA
Model Number FV-250 Place of Origin SHANGHAI
High Light Jetties hydraulic pile driverWater Driven hydraulic pile driverJetties excavator sheet pile driver

Description

 

Mini hydraulic pile driver for the company's original products, its birth to fill the industry gap; Changed the history of small excavator can not be refitted pile driver; Solve the problem that small foundation pile can not be mechanized construction.

This series of models for the new rural reconstruction of the basic engineering construction has made an outstanding contribution.

 

 

Features

  • Pile driving steel sheet pile, cement pile, steel rail pile, iron plate, H steel
  • Quick converting operation; Applied to various working environments.
  • Compared to other systems , less force required for pile pulling
  • Not damage the top or bottom of steel pipe pile, steel plate pile and steel rail pile.
  • Not damage the building even often work near it.
  • Adopted Rubber sheath to reduce noise and vibration, the operation is quiet and the working period is short;It is helpful to overcome environmental problems.
  • According to the placement direction of sheet pile and site conditions, the sheet pile can be clamped or lowered by positive and negative rotation of 180 °. The vibration frequency can be adjusted by two levels, and the two-level double pumps are combined to greatly increase the excitation force.
  • Hydraulic motor has small volume and light weight, but it can output high power and high speed.
  • Vibration frequency can be adjusted by variable pump. It can be used in excavator operation of any brand, and can meet different work requirements only after changing chucks.

 

Technical Parameter

 

Item FV-250 FV-280 FV-300 FV-330 FV-350L FV-350 FV-400
Vibration Frequency  (rpm) 2800 2800 3200 3200 3200 3200 3200
Operation Pressure  (Mpa) 30 32 32 32 32 32 32
Centrifugal Force  (KN) 265 335 350 372 435 455 485
Max.Pile Length  (m) 10 12 12 12 15 15 18
Arm Weight  (kg) 500 500 670 670 670 750 750
Hammer Weight  (kg) 1700 1900 2100 2300 2400 2600 2700
Excavator  (T) 20-30 20-30 30-35 33-40 35-40 40-45 45-60

 

 

 

FAQ

 

Q: How long is the warranty period ?

 

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

 

Q: What is the MOQ ?

 

A: 1 set is available.

 

Q: What's the payment method ?

 

A: We accept T/T and D/P payment.

 

Q: What is the delivery time ?

 

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

 

Q: Can I have our LOGO on the machine ?

 

A: Of course you can.

 

Q: How is your product quality ?

 

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

 

Q: Can I be your dealer ?

 

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Importer,Exporter,Seller

  • Year Established:

    2009

  • Total Annual:

    800,000-10,000,0000

  • Employee Number:

    60~80

  • Ecer Certification:

    Verified Supplier

Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil... Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 (but started its research and develpment and local selling from 2009), A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our hydraulic company take the latest high speed vibrating pil...

+ Read More

Get in touch with us

  • Reach Us
  • Shanghai Yekun Construction Machinery Co., Ltd.
  • No.3652, Cao'an Road, Jiading district, Shanghai
  • https://www.hydraulic-piledriver.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement