China factories

China factory - Foshan Glawall Building Materials Co., Ltd

Foshan Glawall Building Materials Co., Ltd

  • China,Foshan
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Aluminum Frame Glass Partition Wall System 90mm 108mm Thickness
China Aluminum Frame Glass Partition Wall System 90mm 108mm Thickness

  1. China Aluminum Frame Glass Partition Wall System 90mm 108mm Thickness

Aluminum Frame Glass Partition Wall System 90mm 108mm Thickness

  1. MOQ: 10 square meters
  2. Price: US$80.00 10 - 99 square meters
  3. Get Latest Price
Payment Terms L/C,D/A,D/P,T/T,Western Union
Supply Ability 3000 square maters per month
Delivery Time 2-3 weeks
Packaging Details wooden package
Material Aluminum frame+glass panel
Transparency Clear
Customizable size, accessories
Competitive price yes
Panel Thickness 90mm, 108mm
glass type strong tempered glass
Frame Material Aluminum
Advantage Competitive price, good service, high professional, quality guarantee
Brand Name Glawall
Model Number Double Glass Partitions with solid partition
Certification SGS, ISO 9001,UL, CE
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C,D/A,D/P,T/T,Western Union Supply Ability 3000 square maters per month
Delivery Time 2-3 weeks Packaging Details wooden package
Material Aluminum frame+glass panel Transparency Clear
Customizable size, accessories Competitive price yes
Panel Thickness 90mm, 108mm glass type strong tempered glass
Frame Material Aluminum Advantage Competitive price, good service, high professional, quality guarantee
Brand Name Glawall Model Number Double Glass Partitions with solid partition
Certification SGS, ISO 9001,UL, CE Place of Origin China
High Light aluminum frame glass partition wall90mm thick glass partition system108mm glass wall partition system


Use our basic layouts and customize them with your dimensions to create simple rooms or design an entire floor of glass office space. Experiment with different layouts to achieve a cost-effective and elegant design. You can mix and match different types of doors, including sliding doors, and finalize the exact door positions at a later stage.


Our partitions come with toughened glass installed as standard, with a thickness of 10mm or 12mm depending on the partition height. A slim, powder-coated aluminum perimeter track secures the glass, creating a frameless glass office partition. The product includes a frameless single door with pull handles, which is single glazed. Additionally, we offer a framed door option, as well as other door options such as lever/lock handles, sliding doors, and double doors.


Our frameless glazed partitions are fixed to your office's existing walls and ceiling using an aluminum frame. Glass partitions and interior glass walls & doors are an excellent way to divide work areas while maintaining light and interaction throughout your office. Installation is included, and the package includes a Single Door.



The installation steps for demountable partition walls, typically include the following:


Partition Up the Ceiling Install the top tracks or ceiling brackets for the partition walls.
Wall Starter Installation Install the wall starter at one end of the partition, ensuring it is securely fixed to the floor and wall.
Ceiling Connection Installation Connect the top tracks or ceiling brackets to the ceiling, ensuring they are level and secure.
Bottom Connection Installation Install the bottom tracks or brackets, aligning them with the top tracks or brackets.
Corner Pole Installation Install corner poles where needed to support the partition walls at corners.
Horizontal Panel Installation Install horizontal panels into the tracks or brackets, ensuring they are level and aligned.
Vertical Panel Installation Install vertical panels between the horizontal panels, ensuring they are plumb and aligned.
Bind Panel Connect the panels together using connectors or clips to secure them in place.
Wall Starter Installation & Vertical Adjustment Adjust the vertical poles to ensure they are vertical and fix them in place.
Top and Bottom Groove Installation & Vertical Adjustment Ensure the vertical poles align with the top and bottom grooves for panel installation.
Corner Pole Installation Install corner poles as needed for support and stability.
Horizontal Panels Connection

Connect horizontal panels together using connectors or clips.

Vertical Panels Connection

Connect vertical panels together using connectors or clips.

Blind Installation

Install blinds or other finishing touches to complete the partition wall installation.


It's important to follow the manufacturer's instructions and guidelines for the specific type of partition walls being installed to ensure proper installation and performance.



Our production time is approximately 3 to 4 weeks. This allows for sufficient time to manufacture the products with quality and attention.
Regarding the transportation terms, we offer a variety of options. EXW (Ex Works) means the buyer takes responsibility for transportation from the seller's premises. FOB (Free on Board) transfers responsibility to the buyer once the goods are on board the ship at the port of departure. CIF (Cost, Insurance and Freight) includes the cost of the goods, insurance, and freight to the destination port. DDU (Delivered Duty Unpaid) delivers the goods to the buyer's specified location without the payment of customs duties. DDP (Delivered Duty Paid) includes the delivery of the goods with all duties paid to the buyer's location. This diverse range of transportation terms gives our customers flexibility and choice to meet their specific needs and preferences.


Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2012

  • Total Annual:

    1500,000-1900,000

  • Employee Number:

    50~100

  • Ecer Certification:

    Verified Supplier

Foshan Glawall Building Materials Co., Ltd is located in Foshan city which is the main aluminum production base in south of China. We're specializing in office partition wall, office pods and operable partition. With a production area of 25000㎡, our production capacity could be up to 3000... Foshan Glawall Building Materials Co., Ltd is located in Foshan city which is the main aluminum production base in south of China. We're specializing in office partition wall, office pods and operable partition. With a production area of 25000㎡, our production capacity could be up to 3000...

+ Read More

Get in touch with us

  • Reach Us
  • Foshan Glawall Building Materials Co., Ltd
  • The 3rd Workshop of Luzhaoxiang, Shatou Xiqiao Industrial Zone (New District), Jiujiang Town, Nanhai District, Foshan City, China
  • https://www.glasspartitionswall.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement