Payment Terms | T/T |
Supply Ability | 10000 rolls per day |
Delivery Time | 1week |
Packaging Details | 25rolls/pallet |
Description | Quality Cover Floors Cardboard |
Performance | Price of Paint Protective Board |
Specifications | 0.82*36.6m |
Material | Shield Masonite Floor Protection Manufactures |
Application | Building decoration and construction |
Purpose | Prevent construction damage and delay |
Brand Name | BTO |
Model Number | CBL-05532120 |
Certification | FSC, SGS |
Place of Origin | DongGuan, China |
View Detail Information
Explore similar products
FSC Certified Flooring Protective Paper No Damage Repair And Save On Your Time,
Customized Printing Flooring Protection Paper Construction Jobsites Window Pad
FSC Certified Flooring Protective Paper OEM Acceptable Contractor Strength
Water Resistance Flooring Protective Sheets Customized Size Floorshell Builders
Product Specification
Payment Terms | T/T | Supply Ability | 10000 rolls per day |
Delivery Time | 1week | Packaging Details | 25rolls/pallet |
Description | Quality Cover Floors Cardboard | Performance | Price of Paint Protective Board |
Specifications | 0.82*36.6m | Material | Shield Masonite Floor Protection Manufactures |
Application | Building decoration and construction | Purpose | Prevent construction damage and delay |
Brand Name | BTO | Model Number | CBL-05532120 |
Certification | FSC, SGS | Place of Origin | DongGuan, China |
High Light | 120inches Floor Protection Paper Roll ,Masonite Floor Protection Paper Roll ,0.82m Flooring Protection Paper |
Builder'S 32''*120'Dry Floor Paper Sheath, Builder'S Floor Protection Paper Roll
The temporary floor protective cardboard can not only shield low-level traffic, but also provide a barrier for many materials commonly used in construction projects. Water, paint and external debris, such as mud and dirt, are away from the existing floor and reduce a lot of time to clean up after a project is completed. The combination of anti-skid design and spill protection technology provides an effective solution for trading paper customers to minimize the impact on existing surfaces that require high requirements for construction projects.
This floor protection paper is large enough for several items, flexible and easy to use. He is an excellent helper for floor protection, which helps to protect the floor and surface from small paint spills and splashes. It is also a major product in the paint and construction industries, providing temporary floor protection.
The main features are durability and multi-purpose. The floor protector paper is heavy enough to protect your floor from the most lasting wear and tear. It can be easily cut and used when necessary.
Features and benefits
Available colors | natural |
Recyclable | yes |
Reusable | yes |
Material type | paper |
ventilation | yes |
an adhesive | no |
Liquid resistance | yes |
Flame retardant | no |
In any construction project, one of the most important preventive measures is to ensure that the finished product area remains in the best condition. Between the equipment, materials and pedestrian traffic involved in the building, the floor of the building is at risk of major damage. From large commercial projects to medium-sized renovation, almost all construction projects need temporary floor protection to avoid scratches and stains.
Our heavy-duty flooring is installed quickly to protect the floor surface from paint, mud, water, driving machinery, pedestrian traffic, blunt impact, and so on. It is reusable and allows the contractor to easily get the maximum from the floor. After the construction project is completed, just scroll and store the board until it is needed again.
Thanks & Regards!
Company Details
Business Type:
Manufacturer
Year Established:
1991
Total Annual:
7,500,000-10,000,000
Employee Number:
800~1100
Ecer Certification:
Active Member
BTO Holding Co., Ltd. was established in 1991. It is an enterprise integrating chemical industry, pulping, papermaking, paper products, research and development, production, and trade. Its production bases are located in Hunan, China and Hanoi, Vietnam. , Kraft Liner cardboard, color cardboard and o... BTO Holding Co., Ltd. was established in 1991. It is an enterprise integrating chemical industry, pulping, papermaking, paper products, research and development, production, and trade. Its production bases are located in Hunan, China and Hanoi, Vietnam. , Kraft Liner cardboard, color cardboard and o...
Get in touch with us
Leave a Message, we will call you back quickly!