Payment Terms | T/T, Western Union |
Supply Ability | 20000 sets per year |
Delivery Time | 7-12 days |
Packaging Details | Standard Export Package |
Product Name | GY-200 Geotechnical Exploration 300 Meters Depth Soil Test Drilling Machine |
Type | Core Drilling Rig |
Power Type | Diesel |
Usage | Water Well |
Warranty | 1 Year |
Drilling Depths | 300 Meters |
Drilling Hole Diameter | Customized |
OEM | Acceptable |
Drilling Angle | 90°~75° |
Brand Name | JINZHOU SHITAN |
Model Number | GY-200 |
Certification | CE ISO |
Place of Origin | China |
View Detail Information
Explore similar products
150 Meters Depth 380v Hydraulic Borewell Machine Diesel Engine Xy-1a
Borehole 100m Mobile Xy 1a Core Drilling Rig Machine
Hard Rock 600m XY-2B Hydraulic Core Drilling Rig
Red XY - 100 Soil Test Drilling Machine Full Hydraulic Water Well Drilling Rig
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 20000 sets per year |
Delivery Time | 7-12 days | Packaging Details | Standard Export Package |
Product Name | GY-200 Geotechnical Exploration 300 Meters Depth Soil Test Drilling Machine | Type | Core Drilling Rig |
Power Type | Diesel | Usage | Water Well |
Warranty | 1 Year | Drilling Depths | 300 Meters |
Drilling Hole Diameter | Customized | OEM | Acceptable |
Drilling Angle | 90°~75° | Brand Name | JINZHOU SHITAN |
Model Number | GY-200 | Certification | CE ISO |
Place of Origin | China | ||
High Light | 200m deep borewell machine ,soil detection deep borewell machine ,200m deep hydraulic borewell machine |
200m Deep Drilling Equipment Manufacturers For Geological Exploration
GY-200 Soil Test Drilling Machine Summary
General geological survey exploration, road and high-rise building foundation exploration, various concrete structure inspection holes, river embankments, subgrade grouting hole drilling and direct grouting, civil water wells and ground temperature central air conditioning, etc.
GY 200 Soil Testing Drilling Rig Product Parameter:
Drilling Depth | 50-300m | |
Max Open Hole Caliber | 300mm | |
Motor power | 20 (kw) | |
Borehole diameter | 75-300 (mm) | |
End Hole Caliber | 75mm | |
Drilling Rod Diameter | 60mm | |
Drilling Angle | 90°~75° | |
Drill Rig Moving Stroke | 300mm | |
Power | Diesel engine 22HP | |
Spindle Speed | 64 128 287 557 r/min | |
Spindle Stroke | 450mm | |
Max.Single Line Lifting Capacity | 2400kg | |
Max.Single Line Lifting Speed | 0.41 0.82 1.64m/s | |
Wirerope Caliber | 13mm | |
Mud Pump | Diesel 170L/min | |
Work Pressure | 1.5Mpa | |
Water inlet pipe diameter | 40mm | |
Water outlet pipe diameter | 30mm |
GY 200 Soil Testing Drilling Rig Mainly Application:
1. In the general survey and exploration of mineral deposits, especially those of nonferrous metals and rare metals, tunnel drilling is used to trace deposits, to explore geological structures, to delineate ore bodies, to sample and verify.
2. In mine excavation, tunnel drilling technology is commonly used to drill underground observation holes, ventilation holes, drainage holes, gas drainage holes, grouting holes, blasting holes, anchor holes and pilot holes for digging tunnels.
3. In other geotechnical engineering construction fields, the equipment and technology of tunnel drilling can be used for slope reinforcement of dam foundation, treatment of geological disasters, support of deep foundation pit, and underground engineering construction of industrial, commercial, traffic, military and other aspects.
4. It is used for the construction of building foundation, workshop foundation, high-speed railway foundation, highway foundation and other rock foundation foundation.
Transportation of water well drilling rig
1. When loading and unloading the water well drilling rig, a flat place shall be selected.
2. Special unloading platform shall be used for loading and unloading.
3. An assistant must be on site to guide, and irrelevant personnel shall not be allowed to approach.
4. After loading, put the suspension rod to the lowest position, pull on the hand brake, put on the reverse gear, pull out the start key and turn off the main power switch
5. Fix the front and rear "eight" of the four tires with iron wire, firmly wedge the front and rear of the tires with wedges, and pull the rear bridge with iron wire.
6. Pull the rearview mirror inward as far as possible and remove it if necessary.
7. When crossing culverts and bridges, pay full attention to whether there is superelevation, and fully slow down when turning.
8. When unloading, release the hand brake first, engage the forward gear and drive down slowly at the lowest speed.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...
Get in touch with us
Leave a Message, we will call you back quickly!