Payment Terms | T/T, Western Union, |
Supply Ability | 2000 sets/month |
Delivery Time | 5 days |
Packaging Details | Wooden Package |
Product Name | Crawler Mounted Drilling Rig Machine |
Model | ST 180 |
Drilling depth | 180m |
Drilling hole diameter | 105-180mm |
Weight | 4.5T |
Dimension(L*W*H) | 3800*1500*2200mm |
Walking speed | 2.5km/h |
Climbing angles (Max.) | 30 degree |
Equipped capacitor | 55KW |
Drill pipe diameter | 76/89mm |
Brand Name | SHITAN |
Model Number | ST-180 |
Certification | ISO 9001 |
Place of Origin | Hebei ,China |
View Detail Information
Explore similar products
550KG Hydraulic Core Drilling Machine
Multifunctional 1.9m/S 600m Crawler Mounted Drill Rig
GK 200 Portable Hydraulic Crawler Mounted Drilling Rig With 8 Wheels Folding
Diesel Rock 28kw 180m Crawler Mounted Drill Rig
Product Specification
Payment Terms | T/T, Western Union, | Supply Ability | 2000 sets/month |
Delivery Time | 5 days | Packaging Details | Wooden Package |
Product Name | Crawler Mounted Drilling Rig Machine | Model | ST 180 |
Drilling depth | 180m | Drilling hole diameter | 105-180mm |
Weight | 4.5T | Dimension(L*W*H) | 3800*1500*2200mm |
Walking speed | 2.5km/h | Climbing angles (Max.) | 30 degree |
Equipped capacitor | 55KW | Drill pipe diameter | 76/89mm |
Brand Name | SHITAN | Model Number | ST-180 |
Certification | ISO 9001 | Place of Origin | Hebei ,China |
High Light | borewell crawler drilling rig ,180m crawler drilling rig ,180m crawler mounted drill rig |
180 Meters Customized Borewell Crawler Drilling Rig Machine For Water Well Drilling
Model | ST180 |
Drilling hole diameter | 140-254mm |
Drilling depth | 180m |
One-time advance length | 3.3m |
Walking speed | 2.5km/h |
Climbing angles (Max.) | 30 |
Equipped capacitor | 55kw |
Using air pressure | 1.7-2.5mpa |
Air consumption | 17-31m³/min |
Drill pipe length | 1.5m, 2.0m, 3.0m |
Drill pipe diameter | 76mm, 89mm |
Rig lifting force | 12t |
Swing speed | 45-65rpm |
Swing torque | 3200-4600(N.m) |
Dimension | 3800*1500*2200mm |
Weight | 4500kg |
ST 180 Crawler Mounted Drilling Rig Features
1. The drilling rig hydraulic transmission of the rig effectively utilizes the power. This makes the overall power loss small and the drilling cost low.200m 300m 400m 500m 600m depth Truck crawler portable compressor DTH water well drilling rig
After starting the engine, run it at low speed for 3-5 minutes, and turn the power head under no-load, so as to facilitate the normal operation of the hydraulic system.
2. During the operation of the drilling rig, the operator shall often observe whether the indications of various instruments are normal, and stop in time for inspection in case of any abnormality.
3. During operation, special attention shall be paid to the operation control handle in place to avoid pressure impact on the system.
4. During use, check and fasten the pipe joints with pressure vibration and the fastening bolts of the oil pump to ensure that there is no oil and air leakage.
5. The drilling rig must be commanded by a specially assigned person when walking, and special attention shall be paid to dangerous sections such as high-voltage line and puddle.
6. No one is allowed to stand within the rotating range of the drilling rig.
7. After the drilling rig is transferred, the crawler must be extended immediately after getting off the flatbed truck.
8. When checking the hydraulic oil, wait until the hydraulic oil cools down.
Five experiences in finding water from large wells in Qingshi Mountain area:
1, The groundwater level of thick limestone is generally deep, and when the water level is shallow, fractured zones and fault zones can be found.
2, Thick marl is generally not easy to drill a well, and a well with good water volume can be found when the supply conditions are good due to severe weathering and fragmentation.
3, The dolomitic gray layer is better in areas with longer seasonal spring periods and is generally not easy to drill wells.
4, When the supply conditions of limestone mixed with shale are very certain, the conditions are better.
5, In general, in the case of engineering drilling rigs, the water level in the limestone formation is not high enough to reach the area, which means that there is generally not enough water pump to continuously pump water.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...
Get in touch with us
Leave a Message, we will call you back quickly!