Payment Terms | T/T, Western Union |
Delivery Time | Within 7-12 days |
Supply Ability | 2000 set/year |
Packaging Details | exported packing |
Product Name | With Air Compressor High Speed ST 350 Meters Depth Crawler Drilling Rig |
Drilling Depth | 350 meters |
Usage | Water Well,civil construction |
Power Type | Diesel,electric |
Dimension(L*W*H) | 2400*950*1400mm |
Maximum opening diameter | 200-400mm |
Type | Rotary Drilling Rig, Core Drilling Rig, Air percussion, anchor drilling machine, anchoring drilling rig |
Color | Yellow ,Customized |
Place origin | Hebei,China |
After sale service | Video Support |
Brand Name | ShiTan |
Model Number | ST 350 |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
550KG Hydraulic Core Drilling Machine
Multifunctional 1.9m/S 600m Crawler Mounted Drill Rig
GK 200 Portable Hydraulic Crawler Mounted Drilling Rig With 8 Wheels Folding
Diesel Rock 28kw 180m Crawler Mounted Drill Rig
Product Specification
Payment Terms | T/T, Western Union | Delivery Time | Within 7-12 days |
Supply Ability | 2000 set/year | Packaging Details | exported packing |
Product Name | With Air Compressor High Speed ST 350 Meters Depth Crawler Drilling Rig | Drilling Depth | 350 meters |
Usage | Water Well,civil construction | Power Type | Diesel,electric |
Dimension(L*W*H) | 2400*950*1400mm | Maximum opening diameter | 200-400mm |
Type | Rotary Drilling Rig, Core Drilling Rig, Air percussion, anchor drilling machine, anchoring drilling rig | Color | Yellow ,Customized |
Place origin | Hebei,China | After sale service | Video Support |
Brand Name | ShiTan | Model Number | ST 350 |
Certification | ISO9001 | Place of Origin | China |
High Light | 350 Meters Depth Crawler Drilling Rig ,Automatic Crawler Drilling Rig ,High Speed Crawler Drilling Rig |
Good Performance High Speed ST 350 Meters Depth Crawler Mounted Drill Rig
Product Description
ST 350 Meters drill water well for farm /industry irrigating, fresh water drinking or anywhere need fresh water. The drilling depth for one time can reach 6.6 meters, which save the time to load the drill pipes and also save the human resources;Adopting double cylinder to lifting, lifting force can reach 24 tons;The four strong legs can lift 1.7 meters, and the real ground clearance can reach 1.45 meters, which easy to stable the machine and convenient for the loading during the transportation;
Product Specifications
Model | ST350 |
Drilling depth | 350m |
Dia.hole | φ140 - 325mm |
Advance Length one time | 6.6m |
Working pressure | 1.7-3.3MPa |
Air consumption | 17-35m³/min |
Length of rod | 1.5m,2m,3m, 6m |
Dia. Of rod | φ89,φ102,φ114 |
Lifting power | 24T |
Rotation torque | 6200-85000N.m |
Rotation Speed | 55-115r/min |
Diesel Engine | Yuchai |
Engine Power | 92Kw/2200rpm |
Travelling speed | 0-2.5 Km/h |
Climb capacity | 30° |
Weight | 9000kgs |
Dimension | 5900x2000x2850mm |
Application | Complicated geological conditions: Rock, Mud, Sand etc. |
Drilling Way | Top drive hydraulic rotary and propulsion, Dth Drilling or Mud Pump Driling |
DTH Hammer | 4",5",6",8",10" Drill hammer or CIR110, 130, 150,170 |
Remark: It is installed with steel track , winch, electric welding machine. |
Product Main Features
1, It has hydraulic automatic feed mechanism structure, improves drilling efficiency, reduces labor intensity.
2, It adapts the ball chunk mechanism instead of the card holder ,it can implement non-stop down the lever, easy to operate, safe and reliable.
3, Winch contains cage, forms a duplex structure supporting the star wheel, it can withstand strong impact.
4, Four groups of vertical box bearing retainer to ensure that the rotation has sufficient rigidity to deal with complicated geological conditions gravel layer, gravel layer, etc.
Drilling Rig Working Attentions
1. After drilling structure of crawler drill bit, the center drilling tool needs to be replaced in time. Firstly, the hole bottom needs to be cleaned, and then the residue at the bottom of the hole is blown clean. After the bit stops rotating, the drilling tool in the drilling rig is slowly lifted up. When the lifting force is good enough to lift the drilling tool, it is appropriate.
2. When the drill bit of crawler drilling rig is summarized in the drilling process, it is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and timely keep the hole clean when necessary, and the drill bit in the drilling rig is not allowed to pull out forcefully during the drilling process.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...
Get in touch with us
Leave a Message, we will call you back quickly!