Payment Terms | L/C, T/T |
Supply Ability | 400,000 Tons/ Year |
Delivery Time | 3-5weeks |
Packaging Details | Single package size: 1200 x 200 x 200 cm |
Product Cost | Affordable |
Weather Resistance | Yes |
Crane Capacity | Customized |
Protective Materials | Galvanized layer |
Window | Aluminum Alloy, PVC |
Lighting System | Optional |
Wind Resistance | ≥150km/h |
Roof Gutter | Color Steel Sheet |
Brand Name | China CT steel structure |
Model Number | warehouse006 |
Certification | SGS |
Place of Origin | china |
View Detail Information
Explore similar products
Customized Design Multi Storey Pre Engineered Steel Structure Workshop
Factory Prefabricated H-shaped Steel Structure Metal Frame Building Industrial
High-strength Steel Structure Factory Building Galvanized H-shaped
Customizable Color Large Span Steel Workshop Lightweight For Optimal Production
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 400,000 Tons/ Year |
Delivery Time | 3-5weeks | Packaging Details | Single package size: 1200 x 200 x 200 cm |
Product Cost | Affordable | Weather Resistance | Yes |
Crane Capacity | Customized | Protective Materials | Galvanized layer |
Window | Aluminum Alloy, PVC | Lighting System | Optional |
Wind Resistance | ≥150km/h | Roof Gutter | Color Steel Sheet |
Brand Name | China CT steel structure | Model Number | warehouse006 |
Certification | SGS | Place of Origin | china |
High Light | fire resistant steel workshop ,prefabricated steel structure workshop ,high security steel workshop |
High Fire Resistance Higher Security Prefabricated Steel Structure Workshop
Product Advantages
1.Flexible functional partitioning and strong compatibility The same steel structure factory building can be divided into production areas, storage areas, and office areas at the same time (realized through steel structure sandwiches), and the loads in each area can be designed separately (for example, the floor load of the production area is 3-5kN/㎡, and the storage area can reach 10-20kN/㎡), there is no need to build multiple buildings separately, reducing the overall investment.
2.Initial investment is controllable and time cost benefits are significant Although the initial cost of the steel structure factory building is slightly higher than that of concrete (about 5%-15% higher), due to the 50% shortening of the construction period, it can be put into operation 2-6 months in advance, bringing additional production benefits to the company (such as a monthly output value of 1 million yuan calculated, an additional 4 million yuan can be created 4 months in advance). Combining initial investment and time benefits is more economical.
3.Low maintenance costs and strong durability After steel structural members are subjected to anti-corrosion treatment (such as hot dip galvanizing and fluorocarbon paint coating), the anti-corrosion life can reach 20-30 years; if they are maintained regularly (re-applied every 5-10 years), the service life can be extended to More than 50 years, equivalent to a concrete factory building. However, concrete factories are prone to cracks and leaks, and the annual maintenance cost is about 1%-2% of the cost, while steel structures only need 0.3%-0.8%, making long-term maintenance costs lower.
4.Modular construction, flexible expansion in the later period The steel structure factory building can be divided and designed according to "modules". If the production capacity needs to be expanded in the later period (such as adding production lines and expanding storage areas), new steel structure modules can be directly spliced with the original factory building without the need to significantly renovate the main structure; disassembly is also convenient. If the project is relocated, the components can be recycled and reused (the recycling rate reaches more than 90%), reducing resource waste.
Product Attributes
| Remark | |
Brace | ordinary, high strength bolt | |
Main frame | H beam | |
Roof &wall | EPS,Rock wool , PU sandwich | |
Insulation panel | EPS,Rock wool , PU sandwich | |
Purlin | C or H section steel purlin | |
Door | Sliding or rolling door | |
Sheet | 0.2mm-0.6mm galvanzied steel sheet | |
Material | Q235B,Q355B China standard steel |
Transport Specifications
Package Size | 100.00cm * 100.00cm * 100.00cm |
Package Gross Weight | 100.000kg |
Product Use
1.Finished product warehousing: Stack the components that have passed the test according to items (such as zoning according to "steel columns of a certain automobile factory" and "a certain bridge grid") to avoid bump and damage, and at the same time facilitate shipment according to orders.
2.Auxiliary materials storage: Store the auxiliary materials needed for production (welding rods, welding wires, coatings, bolts, insulation cotton, etc.) to ensure uninterrupted supply of materials during the production process.
3.Component packaging: Packaging vulnerable components (such as special-shaped nodes and thin-walled components)(wrapped with film and fixed with wooden supports) to prevent deformation and corrosion during transportation.
4.Coordination of loading and transportation: Deploy special transportation vehicles (flatbeds, trailers) according to the size of the component (such as ultra-long steel beams and heavy steel columns), coordinate logistics routes, and deliver the components to the downstream construction site on time.
Product Picture
Company Introduction
China CT Steel Structure Co., Ltd is a comprehensive industrial group that integrates steel structure research and development, design, manufacturing, production, and installation. Since its establishment in 2004, it coversan area of approximately 300000 square meters and produces 200000 tons of steel structures annually. We have over 500 well-trained employees, more than 100 professional design teams, after-sales service teams, and many advanced equipment.
The company has 30 steel structure production lines, specializing in the design, manufacturing, and installation of industrial and civil buildings such as steel structure factories, warehouses, high-rise steel structure buildings, office buildings, exhibition,halls, sports halls, parking garages, prefabricated houses, and agricultural projects. We are committed to providing customers with innovative solutions that not only meet their expectations, but also exceed them.
Why choose us?
+1. We have 21 years of industry experience.
+2.Professional design team with an annual output of 400,000 tons to meet customer needs.
+3.Savings: Buying directly from our factory saves at least 30%-40% compared to buying from the local market.
+4.24-hour online service, 100% quality assurance, once a quality problem occurs, it will be fully solved for you immediately.
Certifications
Transport
FAQ
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2004
Employee Number:
500~500
Ecer Certification:
Verified Supplier
China CT Steelstructure Co., Ltd. is a comprehensive industrial group integrating the research and development, design, manufacturing, production and installation of steel structures. Since its establishment in 2004, it has covered an area of approximately 300,000 square meters and has an an... China CT Steelstructure Co., Ltd. is a comprehensive industrial group integrating the research and development, design, manufacturing, production and installation of steel structures. Since its establishment in 2004, it has covered an area of approximately 300,000 square meters and has an an...
Get in touch with us
Leave a Message, we will call you back quickly!