Payment Terms | L/C, T/T |
Supply Ability | 400,000 Tons/ Year |
Delivery Time | 3-5weeks |
Packaging Details | Single package size: 1200 x 200 x 200 cm |
Weight | Customized Kg |
Knee Brace | Angle Steel |
Fire Protection System | Optional |
Service Life | 50 Years |
Finishing | Painting |
Design | Design as the customer's drawing |
Wall Color | White, Blue, Optional Colors |
Standard | AiSi |
Brand Name | China CT steel structure |
Model Number | warehouse006 |
Certification | SGS |
Place of Origin | china |
View Detail Information
Explore similar products
Customized Design Multi Storey Pre Engineered Steel Structure Workshop
Factory Prefabricated H-shaped Steel Structure Metal Frame Building Industrial
High-strength Steel Structure Factory Building Galvanized H-shaped
Customizable Color Large Span Steel Workshop Lightweight For Optimal Production
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 400,000 Tons/ Year |
Delivery Time | 3-5weeks | Packaging Details | Single package size: 1200 x 200 x 200 cm |
Weight | Customized Kg | Knee Brace | Angle Steel |
Fire Protection System | Optional | Service Life | 50 Years |
Finishing | Painting | Design | Design as the customer's drawing |
Wall Color | White, Blue, Optional Colors | Standard | AiSi |
Brand Name | China CT steel structure | Model Number | warehouse006 |
Certification | SGS | Place of Origin | china |
High Light | steel structure workshop building ,easy maintenance steel workshop ,logistics storage steel building |
Logistics Storage Easy Maintenance For Steel Structure Workshop Building
Product Advantages
1.Flexible spatial layout: The design of the steel structure factory building can be flexibly adjusted according to actual needs to meet the needs of different industrial production
2.Light weight, high strength, and large span: Although steel has a higher density than other building materials, its strength is very high. Under the same stress, the steel structure has a small dead weight and can be made into a structure with a larger span.
3.Good lighting: Install lighting panels or lighting glass at specific locations on the roof. Taking into account the service life of the skylight and the coordination of the roof panels, the joints must be water-proofed.
4.Modular construction, flexible expansion in the later period The steel structure factory building can be divided and designed according to "modules". If the production capacity needs to be expanded in the later period (such as adding production lines and expanding storage areas), new steel structure modules can be directly spliced with the original factory building without the need to significantly renovate the main structure; disassembly is also convenient. If the project is relocated, the components can be recycled and reused (the recycling rate reaches more than 90%), reducing resource waste.
Product Attributes
| Remark | |
Brace | ordinary, high strength bolt | |
Main frame | H beam | |
Roof &wall | EPS,Rock wool , PU sandwich | |
Insulation panel | EPS,Rock wool , PU sandwich | |
Purlin | C or H section steel purlin | |
Door | Sliding or rolling door | |
Sheet | 0.2mm-0.6mm galvanzied steel sheet | |
Material | Q235B,Q355B China standard steel |
Transport Specifications
Package Size | 100.00cm * 100.00cm * 100.00cm |
Package Gross Weight | 100.000kg |
Product Use
1.Temporary production workshop For production tasks with short project duration and urgent needs (such as post-disaster reconstruction materials production and seasonal order expansion), the steel structure workshop can be quickly prefabricated and assembled on site. The construction period is only 1/3 of that of a traditional concrete workshop, and it can be removed and recycled after the project is over. Steel can be removed and reduced waste of resources.
2.Emergency support workshop After natural disasters (such as earthquakes and floods), temporary steel structure workshops can be quickly built as a site for material production and equipment repair. Its disaster-resistant performance (earthquake resistance and wind resistance) can also ensure the safety of emergency production.
3.Finished product/logistics transfer workshop As a logistics distribution center for e-commerce and manufacturing industries, the steel structure workshop can flexibly divide storage areas, sorting areas, and loading and unloading areas, and is convenient to install conveyor belts and automated sorting equipment; if a sandwich is needed, the load-bearing performance of the steel structure can also Meet the needs of multi-layer operations.
4.Low temperature/clean workshop For example, in food freezing workshops, electronic chip cleaning workshops, etc., the integrity of the steel structure is good, which is convenient for thermal insulation or sealing treatment to reduce cold loss or infiltration of external pollutants; and the low-temperature toughness of the steel is controllable (low-temperature steel is selected), can adapt to the cold storage environment below-30 ℃.
Product Picture
Company Introduction
China CT Steel Structure Co., Ltd is a comprehensive industrial group that integrates steel structure research and development, design, manufacturing, production, and installation. Since its establishment in 2004, it coversan area of approximately 300000 square meters and produces 200000 tons of steel structures annually. We have over 500 well-trained employees, more than 100 professional design teams, after-sales service teams, and many advanced equipment.
The company has 30 steel structure production lines, specializing in the design, manufacturing, and installation of industrial and civil buildings such as steel structure factories, warehouses, high-rise steel structure buildings, office buildings, exhibition,halls, sports halls, parking garages, prefabricated houses, and agricultural projects. We are committed to providing customers with innovative solutions that not only meet their expectations, but also exceed them.
Why choose us?
+1. We have 21 years of industry experience.
+2.Professional design team with an annual output of 400,000 tons to meet customer needs.
+3.Savings: Buying directly from our factory saves at least 30%-40% compared to buying from the local market.
+4.24-hour online service, 100% quality assurance, once a quality problem occurs, it will be fully solved for you immediately.
Certifications
Transport
FAQ
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2004
Employee Number:
500~500
Ecer Certification:
Verified Supplier
China CT Steelstructure Co., Ltd. is a comprehensive industrial group integrating the research and development, design, manufacturing, production and installation of steel structures. Since its establishment in 2004, it has covered an area of approximately 300,000 square meters and has an an... China CT Steelstructure Co., Ltd. is a comprehensive industrial group integrating the research and development, design, manufacturing, production and installation of steel structures. Since its establishment in 2004, it has covered an area of approximately 300,000 square meters and has an an...
Get in touch with us
Leave a Message, we will call you back quickly!