Payment Terms | L/C, T/T |
Supply Ability | 20pcs/month |
Delivery Time | 5days |
Packaging Details | Export standards |
Adapted models | pump truck |
Factory code | A820405000086 |
Weight | 2kg |
Brand Name | OEM |
Model Number | Connection between transfer case housing and 055 arm pump |
Place of Origin | Chang sha China |
View Detail Information
Explore similar products
Danfoss Pressure Transmitter MBS1250 48mm*22mm*22mm
HAVE SCP-034L Arm Rack Oil Pump Polishing regular size
Truck Mounted Concrete Pump Remote Control
Stepper Motor For SANY Concrete Line Pumps 60C1816D.19A.4.1
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 20pcs/month |
Delivery Time | 5days | Packaging Details | Export standards |
Adapted models | pump truck | Factory code | A820405000086 |
Weight | 2kg | Brand Name | OEM |
Model Number | Connection between transfer case housing and 055 arm pump | Place of Origin | Chang sha China |
High Light | Concrete Pump 3Axis End Cover ,Pump Transfer Case 3Axis End Cover |
Sany And Zoomlion Concrete PumpTransfer Case Three-Axis End Cover Connection Between Transfer Case Housing And 055 Arm P
The installation of the PTO (Power Take-Off) split gearbox oil pump flange in a concrete pump truck involves the following steps:
Positioning: The flange is positioned on the designated mounting area of the PTO split gearbox. It is essential to align the bolt holes on the flange with those on the gearbox to ensure a proper fit.
Mounting Bolts: The flange is secured to the PTO split gearbox using mounting bolts. These bolts are inserted through the bolt holes on the flange and threaded into the corresponding holes on the gearbox. It is important to tighten the bolts evenly and securely to ensure a stable and leak-free connection.
Gasket Placement: A gasket, typically made of a material such as rubber or fiber, is placed between the flange and the gearbox. The gasket helps create a seal and prevents oil leakage at the connection point. The gasket is positioned in such a way that it lines up with the bolt holes on both the flange and the gearbox.
Tightening Bolts: Once the gasket is in place, the mounting bolts are tightened further. It is crucial to follow the specified torque requirements provided by the manufacturer to achieve the proper tightness. This ensures a secure and reliable connection between the flange and the PTO split gearbox.
Inspection: After the flange is installed and the bolts are tightened, a visual inspection is performed to ensure that the flange is properly aligned and there are no signs of misalignment, damage, or leakage. Any issues should be addressed and resolved before operating the concrete pump truck.
It is important to note that the specific installation process may vary depending on the concrete pump truck model and manufacturer's instructions. It is recommended to consult the equipment's manual or seek professional guidance during the installation procedure to ensure proper installation and operation of the PTO split gearbox oil pump flange.
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2020
Total Annual:
200-500
Employee Number:
55~100
Ecer Certification:
Verified Supplier
Changsha Tongchuang Mechanical Co., Ltd. is located in Changsha, Hunan, the capital of China's construction machinery. It is a service-oriented company integrating production, whole machine maintenance and remanufacturing, second-hand equipment, spare parts sales, new material application and ex... Changsha Tongchuang Mechanical Co., Ltd. is located in Changsha, Hunan, the capital of China's construction machinery. It is a service-oriented company integrating production, whole machine maintenance and remanufacturing, second-hand equipment, spare parts sales, new material application and ex...
Get in touch with us
Leave a Message, we will call you back quickly!