Payment Terms | 30% T / T in advance and 70% balance before shipment Or 100% L/C at sight |
Supply Ability | 100 sets / month |
Delivery Time | 5-8 working days |
Packaging Details | Nude ,3 Sets Fasten Packing in 1 40HQ |
Max.Dump Clearance | 3200mm |
Rated power | 58kw |
Rated Load | 1800kg |
Bucket Capacity | 1.0m3 |
Overall Size (L*W*H) | 5500*1620*2750mm |
Operating Weight | 3500 kg |
Bucket Length | 1.9m |
Dump Reach | 1350mm |
Brand Name | MCLLROY |
Model Number | MCL932 ZL932 |
Certification | CE,ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
Compact Front End Wheel Loader Multifunctional Applications In Construction And
Multifunctional Small Wheeled Loader 58kw For Construction Engineering
2 Ton 58kw Mini Wheeled Loader For Industrial Construction Machinery
Flexible Front Wheel Shovel Machine Small 58kw 1800kg Rated Load
Product Specification
Payment Terms | 30% T / T in advance and 70% balance before shipment Or 100% L/C at sight | Supply Ability | 100 sets / month |
Delivery Time | 5-8 working days | Packaging Details | Nude ,3 Sets Fasten Packing in 1 40HQ |
Max.Dump Clearance | 3200mm | Rated power | 58kw |
Rated Load | 1800kg | Bucket Capacity | 1.0m3 |
Overall Size (L*W*H) | 5500*1620*2750mm | Operating Weight | 3500 kg |
Bucket Length | 1.9m | Dump Reach | 1350mm |
Brand Name | MCLLROY | Model Number | MCL932 ZL932 |
Certification | CE,ISO9001 | Place of Origin | China |
High Light | Hydraulic 2 Ton Wheel Loader ,2 Ton Wheel Loader 1350mm ,Compact Mini Loaders 2 Ton |
1. Products Description
If you're looking for a small machine with bigger performances,then MCLLROY wheel loader is made for you with its amazing lifting and dumping height and huge breakout force when it is equipped with buckets,or with pallet forks, guaranteed max productivity.
We use Yunnei engine for this loader. Many developing countries do not currently have strict requirements on engine emissions. Therefore, for export to Southeast Asia, we use Yunnei engines. Yunnei engines are relatively stable in performance and affordable, and can be described as the most cost-effective engine among small loaders.
2. Specification
Model | MCL932 ZL932 | ||
Max.Dump Clearance | mm | 3200 | |
Rated power | kw | 58 | |
Rated Load | kg | 1800 | |
Bucket Capacity | m³ | 1.0 | |
Overall Size (L*W*H) | mm | 5500*1620*2750 | |
Operating Weight | kg | 3500 | |
Bucket Length | m | 1.9 |
3. Details and Advantages
The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts.
1) Engine: Domestic famous engines ,green/turbocharged/inter-cooled engine.
2) Transmission: Wet multi-plate clutch automatic transmission ,torque converter ,stable performance ,famous brand in China.
3) Axle: Heavy-duty axle ,planetary reduction ,solid and durable ,with the corresponding tires ,for the loader to provide.
4) Hydraulic system:Precision hydraulic cylinder and the fourth generation hydraulic transmission system give large breakout force for earth-moving work.
4.Production lines:
A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection
Spray painting:
Normally, the spray painting process includes hanging the parts, spraying primer or first layer coating, baking finish, spraying second layer coating, baking finish, drying in three different temperature.
The workers in charge of hanging will check if the part has dust and oil, anything that will affect painting, which will be removed.
There are two worker at Station 1 to do the painting on one side of the part.
Another 2 workers at Station 2 will paint the other side, and the third worker will check if there is any spot missing and repaint.
Next is our baking room and No. 1 to No. 3 drying machines.
Pick up station workers use forklift to transfer the finished parts to the part's corresponding storage place, which is usually next to the production line.
Some factories only hire one person to take care of the spray painting to cut the cost. It is hard to control the painting quality like that.
Our technicians in the painting process are supposed to control the painting flow rate just right, without over painting, and the thickness of each surface should be balanced. In the pick up Station, there are special personnel for quality inspection of painted parts. Similarly, our factory adopts report mechanism. Subsequent assembly or factory inspection inspector find that the spray painting is unqualified and they will report it.
Similar Model:
Cat 903D/906M/907M/908M
XCMG LW156/LW160/LW180/LW186/LW200
Liugong 816C
SDLG LG916 LG918 L918
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
1981
Total Annual:
100,000,000-200,000,000
Employee Number:
500~800
Ecer Certification:
Verified Supplier
Chanchiyo Holdings Group began in 1981, mainly engaged in the production and sales of small loaders, medium loaders, storage forklifts and other products. With the continuous expansion of business, it has gradually become a supply chain holding group integrating machinery manufacturing,... Chanchiyo Holdings Group began in 1981, mainly engaged in the production and sales of small loaders, medium loaders, storage forklifts and other products. With the continuous expansion of business, it has gradually become a supply chain holding group integrating machinery manufacturing,...
Get in touch with us
Leave a Message, we will call you back quickly!