China factories

China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China High Efficient Seamless Boiler Header Manifold For Heat Exchange Boiler
China High Efficient Seamless Boiler Header Manifold For Heat Exchange Boiler

  1. China High Efficient Seamless Boiler Header Manifold For Heat Exchange Boiler
  2. China High Efficient Seamless Boiler Header Manifold For Heat Exchange Boiler
  3. China High Efficient Seamless Boiler Header Manifold For Heat Exchange Boiler
  4. China High Efficient Seamless Boiler Header Manifold For Heat Exchange Boiler

High Efficient Seamless Boiler Header Manifold For Heat Exchange Boiler

  1. MOQ: 1 Set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 500 tons/month
Delivery Time 30 working days
Packaging Details Seaworthy Packing
Condition New
Specification Customized
Application Power Station
Material Carbon Steel/Stainless Steel/Alloy Steel
OEM Yes
Color Customized
Brand Name HDB
Model Number Boiler Manifold Header
Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin Jiangsu , China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 500 tons/month
Delivery Time 30 working days Packaging Details Seaworthy Packing
Condition New Specification Customized
Application Power Station Material Carbon Steel/Stainless Steel/Alloy Steel
OEM Yes Color Customized
Brand Name HDB Model Number Boiler Manifold Header
Certification ISO9001 , SGS , TUV , ASME , EN Place of Origin Jiangsu , China
High Light header in boiler headers and manifolds
 
 

 

High Efficient Seamless Boiler Header Manifold For Heat Exchange Boiler

 
 
 
Product Description of Header

 

The main function is to collect the working materials or redistribute the working materials to other pipelines through the collecting box, that is, to collect and mix the working materials, to ensure the uniform distribution of working materials and even distribution of the working materials.
When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers. Such welding methods have high manufacturing efficiency, good quality, beautiful welding shape, safety, reliability, etc.
 
Material Carbon steel,Alloy steel,Stainless steel.
Length According to costumes requirements.
Temperature Range 300℃~1500℃
Diameter(OD)

76mm~914mm

 

 

Function of Header


The collecting box is the pipe fitting for boiler working medium mixing and ensuring uniform heating of working medium.Industrial boiler furnace wall is usually composed of rows and rows of tubes (water wall) together, but boiler huge volume, complicated structure, cannot guarantee that all the working medium in the pipe of heat absorption capacity is the same, different parts of heat absorption differs a lot, install header can let each pipe working medium inside converge here, the redistribution to the next level in the tube, so that we can reduce the thermal deviation, make the working medium heat, cooling flow, boiler, the boiler thermal efficiency are optimized to improve;In addition, the size, quantity and arrangement of pipes in the upper, middle and lower parts of the boiler are different, and the collecting box is responsible for connecting each section to ensure the smooth flow of working quality.

 

 

Features of Header


1. Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.

5.Excellent in welding quality, highly automatic, safe and reliable.

 

 

Details of Header


1.Our products are manufactured by way of hot pressing and seamless steel tube retraction on special back neck machine.

2.In this way, obstacles will have thicker walls and cleaner surfaces.The film stress instead of bending stress is formed under the action of internal pressure, which has ideal stress performance.

 

 

 

Classification of Header


 

1 Headers form an important part of all types of boilers.
2 Steam from the generating tubes is collected in headers which are therefore always under pressure.
3 This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4 Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

 

 

Materials 


1. Carbon steel:20G,SA-106B,SA-106C,etc.

2. Low-alloy thermal resistant steel:15CrMoG,12Cr1MoVG,SA-335P12,SA335-P22,etc.

3. Middle-alloy thermal resistant steel:SA-335P91,etc.

4. Special material(ultra-supercritical):SA-335P122,SA-335P92,etc.

 

 

Factory Workshop


Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement