Payment Terms | L/C, T/T |
Supply Ability | 500 Tons per Month |
Delivery Time | 30 Working Ddays after Deposit |
Material | Carbon steel , Stainless steel |
Output | Hot Water / Steam |
Application | Power plant boiler |
Fuel | Coal , Biomass |
Color | Grey / Red / Customized |
Type | Boiler Tube |
Brand Name | HDB |
Model Number | Energy saving economizer |
Certification | ISO9001 , SGS , TUV , ASME , EN |
Place of Origin | Jiangsu China |
View Detail Information
Explore similar products
SA210A1 Steel Boiler Economizer Heat Exchange Part ISO9001 Certification
Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat
Biomass Boiler Economizer With Carbon Steel Seamless Tube H Fin High Frequency
Boiler Heat Exchanger , Boiler Spiral Fin Tube Economizer ,Economizer Module in
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 500 Tons per Month |
Delivery Time | 30 Working Ddays after Deposit | Material | Carbon steel , Stainless steel |
Output | Hot Water / Steam | Application | Power plant boiler |
Fuel | Coal , Biomass | Color | Grey / Red / Customized |
Type | Boiler Tube | Brand Name | HDB |
Model Number | Energy saving economizer | Certification | ISO9001 , SGS , TUV , ASME , EN |
Place of Origin | Jiangsu China | ||
High Light | power plant economizer ,economizer for boiler |
Product Description
Economizer is a mechanical device intended to reduce energy consumption, or to perform another useful function like preheating a fluid. The economizer is used for other purposes as well boiler, powerplant, and heating, ventilating, and air-conditionin(HVAC) uses are discussed in this article. In simple terms, an economizer is a heat exchanger.
Parameter
Name(unit) | Specification(mm) |
Bare pipe(OD) | 25-165 |
Bare pipe(Thickness) | 2-8 |
Fin (Thickness) | 0.6-3.0 |
Fin (Height) | 5-30 |
Fin tube thread pitch | 5-30 |
Fin tube length | ≤12000 |
*Note:HD BOILER can bespoke special type of economizer according to customer's requirement.
Details
1.Economizers must be sized for the volume of flue gas, its temperature, the maximum pressure drop allowed through the stack, what kind of fuel is used in the boiler, and how much energy needs to be recovered.
2.Economizers designed for natural gas only, would likely plug-up if installed on a coal boiler and would face increased risk of corrosion if installed on an oil-fired boiler.
3.Some units are designed to keep the flue gases above condensation temperature, and others are made of materials that resist the corrosive effect of condensed flue gases.
Application
In boilers , economizers are heat exchange devices that heat fluids, usually water, up to but not normally beyond the boiling point of that fluid. Economizers are so named because they can make use of the enthalpy in fluid streams that are hot, but not hot enough to be used in a boiler, thereby recovering more useful enthalpy and improving the boiler's efficiency.
They are a device fitted to a boiler which saves energy by using the exhaust gases from the boiler to preheat the cold water used to fill it (the feed water).
When you purchase a thermal fluid heater, the cost of fuel to operate the heater is a major concern. The amount of fuel needed is related to the thermal efficiency of the heater. Increasing its thermal efficiency reduces the amount of fuel needed as well as operating costs.
Company Introduction
HD Boiler offers a best in class facility,including:
Fabrication area of 200,000 square meters
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!