China factories

China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China ASME/GB Standard Carbon Steel Low Temperature Economizer for Application of
China ASME/GB Standard Carbon Steel Low Temperature Economizer for Application of

  1. China ASME/GB Standard Carbon Steel Low Temperature Economizer for Application of
  2. China ASME/GB Standard Carbon Steel Low Temperature Economizer for Application of
  3. China ASME/GB Standard Carbon Steel Low Temperature Economizer for Application of
  4. China ASME/GB Standard Carbon Steel Low Temperature Economizer for Application of

ASME/GB Standard Carbon Steel Low Temperature Economizer for Application of

  1. MOQ: 1 Set / Sets 10tons
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 500 Tons per month
Delivery Time 60 Days
Packaging Details Seaworthy Packing
Placement Before ESP or Before FGD
Painting Antirust paint
Material ND Steel / Carbon steel
Name Furnace Economizer
Operation Natural circulation
Output Steam / Hot water
Brand Name HD BOILER
Model Number Economizer
Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 500 Tons per month
Delivery Time 60 Days Packaging Details Seaworthy Packing
Placement Before ESP or Before FGD Painting Antirust paint
Material ND Steel / Carbon steel Name Furnace Economizer
Operation Natural circulation Output Steam / Hot water
Brand Name HD BOILER Model Number Economizer
Certification ISO9001 , SGS , TUV , ASME , EN Place of Origin China
High Light power plant economizereconomizer for boiler

ASME/GB Standard Low Temperature Economizer Module for Application of Boiler Systems​​

 

Introduction

 

Exhaust heat loss is the largest of the heat loss of the power plant boiler, usually 5% to 8%, accounting for 80% of the total heat loss of the boiler or higher.
The main factors that affect the heat loss of the exhaust gas are the boiler exhaust temperature. Under normal circumstances, the exhaust heat temperature increases by 10 ℃ and the exhaust heat loss increases by 0.6% ~ 1.0%.

China's current thermal power units in the boiler exhaust gas temperature is generally around 125 ~ 150 ℃, the actual smoke temperature is higher than the design value is ubiquitous phenomenon.

 

Low temperature economizer

 

"Low temperature economizer", can greatly reduce the flue gas temperature, so that the flue gas temperature be reduced lower 40 ~ 50 ℃ or more.

The energy absorbed by the "low temperature economizer" can be used to heat the condensate or to increase the temperature of the combustion air by heating the air through the heater.

Power plant boiler using "low temperature economizer", can save 1 ~ 4g / kWh, unit efficiency increased by 0.2 to 1.2%. "Low temperature economizer" in the full recovery and utilization of exhaust heat at the same time, but also to achieve the best desulfurization efficiency of smoke temperature, greatly reducing the desulfurization tower to reduce the smoke and water spray cooling water consumption.

Under normal circumstances, it takes 1 ~3 years for power plant 1 to recover the investment in "low temperature economizer" and its system equipment , that is to say, the economic benefits are enormous.

 

Performance advantages

 

1.Application of flue gas waste heat recovery system for tail flue of power plant boiler

The thermal temperature is low, usually 100℃ or so with not good quality.

 

(1) This part of the recovery of heat is not equivalent to the method of calculation, but should be equivalent conversion method or heat balance calculation to determine the effective use of heat recovery value (thermodynamics second law).

 

2. Used in other industrial boilers in the flue gas waste heat recovery device

 

(1) Under normal circumstances, the economy is in priority in power plant application. This is because in other industrial boiler systems, the available steam resources are limited. For users with not enough steam, the recovery of heat can be considered 100% available resources, the most economical.

 

(2) flue gas waste heat exchanger advantages

 

improve the efficiency of recycling, reduce coal consumption;
improve the efficiency of dust removal (before the installation of dust collector);

reduce the evaporation of desulfurization tower, saving water.

 

 Product display

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement