China factories

China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U
China Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U

  1. China Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U
  2. China Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U
  3. China Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U
  4. China Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U

Carbon Steel Coils Superheater And Reheater Processing Plant Ball Passing U

  1. MOQ: 1 set / 10tons
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 1500 Tons / Month
Delivery Time 50 ~ 100 Days
Packaging Details Seaworthy packing
Material Carbon or Alloy steel
Type Serpentuator
Treatment Electrical furnance
Hydraulic test Accept
Tube thickness Applicable
Ovality Check
Brand Name HD BOILER
Model Number Superheater and Reheater
Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 1500 Tons / Month
Delivery Time 50 ~ 100 Days Packaging Details Seaworthy packing
Material Carbon or Alloy steel Type Serpentuator
Treatment Electrical furnance Hydraulic test Accept
Tube thickness Applicable Ovality Check
Brand Name HD BOILER Model Number Superheater and Reheater
Certification ISO9001 , SGS , TUV , ASME , EN Place of Origin China
High Light convection superheater reheater in power plant

Carbon steel coils superheater and reheater processing plant ball passing U-bending ovality test

 

Description

 

1 The efficiency of the steam cycle is improved by higher steam pressure and tempera­ture as well as reheating.
2 Both superheating and reheating of steam have to be as high as possible. At a steam pressure of 120 bar and higher, the cycle efficiency improves by —1% for every 20°C rise in superheat.
3 Therefore, high superheats are desired for each band of pressure consistent with the metallurgy of the turbine.

 

Superheater(SH)

 

In a subcritical boiler, the SH is between the main-steam header and the steam drum and consists of
• Saturated tubes that transport steam from the drum to the SH inlet header (when the SH tubes are not directly connected to the drum)

• Superheater banks with their respective inlet and outlet headers

• Attemperator station for STC
• Main-steam header with all fittings and terminating with the main-steam stop valve (MSSV)
Steam from the steam drum flows toward the main-steam header, and there should be no valve between the two to ensure flow in SH tubes under all conditions to prevent over­heating and failure.

 

Reheater(RH)

 

Reheating of steam involves withdrawal of partly expanded steam (at the end of the high — pressure cylinder of the turbine), taking it back to the boiler in cold reheat pipes, heating to the same or higher temperature as the superheated steam, and returning to the turbine in hot reheat pipes. In terms of hardware, an RH system comprises

 

• Cold reheat pipe from turbine to boiler
• Safety valves on the cold reheat pipe
• Emergency spray-water attemperator system on a cold reheat pipe or interconnect­ing pipe
• Reheater bank complete with inlet and outlet headers

• Hot reheat pipe from boiler to turbine

 

Superheater and Reheater Design Principles

 

1.Superheater and reheater are the tube banks that attain the highest temperatures in a boiler and consequently require the greatest care in the design, fabrication, and O&M to ensure that the permissible metal temperatures are never exceeded.

 

2.The final sec­tions of both SH and RH must be placed in the highest gas temperatures, which calls for adopting the most appropriate high-temperature alloy for the tubing from consider­ations of the following information.

 

• Metal temperatures

• Fouling due to ash compounds

• Corrosion due to salts in ash

 

The three most important aspects of the design of both SH and RH are:

 

1 Uniform distribution of steam and gas across all the sections to minimize unbal­ance of flows.
2 Optimally high steam velocity in all the tubes to keep the metal temperatures as low as possible.

 

Product

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement