Payment Terms | L/C, D/A, T/T, Western Union, MoneyGram |
Supply Ability | 500tons per month |
Delivery Time | 30-100 days |
Packaging Details | Iron frame package |
Condition | New |
Structure | Fire / Water Tube |
Fuel | Coal / Gas / Oil-fired Water Heat |
Type | Natural Circulation / Once Through |
Pressure | High / Low Pressure |
Output | Hot Water / Steam |
Usage | Industry / Power Station |
Surface Treatment | Painted |
HS Code | 3215960855 |
Brand Name | HD BOILER |
Model Number | Customization |
Certification | ISO9001 / SGS / TUV / ASME / EN |
Place of Origin | Jiangsu , China |
View Detail Information
Explore similar products
SA210A1 Steel Boiler Economizer Heat Exchange Part ISO9001 Certification
Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat
Biomass Boiler Economizer With Carbon Steel Seamless Tube H Fin High Frequency
Boiler Heat Exchanger , Boiler Spiral Fin Tube Economizer ,Economizer Module in
Product Specification
Payment Terms | L/C, D/A, T/T, Western Union, MoneyGram | Supply Ability | 500tons per month |
Delivery Time | 30-100 days | Packaging Details | Iron frame package |
Condition | New | Structure | Fire / Water Tube |
Fuel | Coal / Gas / Oil-fired Water Heat | Type | Natural Circulation / Once Through |
Pressure | High / Low Pressure | Output | Hot Water / Steam |
Usage | Industry / Power Station | Surface Treatment | Painted |
HS Code | 3215960855 | Brand Name | HD BOILER |
Model Number | Customization | Certification | ISO9001 / SGS / TUV / ASME / EN |
Place of Origin | Jiangsu , China | ||
High Light | power plant economizer ,economizer for boiler |
Name | Economical low installation costs better performance boiler economizer for CFB boiler |
specifications of finned tube | unit(mm) |
Bare pipe(od) | 25-165 |
bare pipe(thick) | 2-8 |
finned thicks | 0.6-3.0 |
finned height | 5-30 |
finned tube thread pitch | 5-30 |
finned tube length | </=12000 |
Remark | 1.Other specifications outside the table should be proposed, it is negotiable. 2.Generally speaking, the height of the fin <=1/2d 3 The spiral finned tubes produced by our company are manufactured according to the principle:JB/T6512-92 DG1020-97 |
Accessory:
The boiler economizer acts as a waste heat recovery device, ensuring that this heat does not go unused.
Instead, the heat is used to essentially preheat the water, so that less heat is required to bring the water to a temperature high enough to make steam
boiler parts Heat exchanger H Fin tube economizer used in utility boilers, industrial boilers, marine power, such as the tail of heat exchanger components.
Performance characteristics :
1. Excellent anti-wear performance
2. Less fouling
3. Compact space
4. Welded Joints less
5. Stability
Other products:
Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer.
Certificate:
Company Introduction:
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!