Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 1000 Tons |
Delivery Time | 5-8 working days |
Packaging Details | Standard exported package |
Material Number | 1.0031 |
Grade | E190 |
Standard | EN 10296-1: 2003 Welded circular steel tubes |
Standard 2 | EN 10305-3: 2002 Steel tubes |
Brand Name | Globa Alloy |
Model Number | 4inch Sch40 |
Certification | API, CE, ISO , PED |
Place of Origin | China |
View Detail Information
Explore similar products
JIS G3463 Bending Stainless Steel Tubing Corrosion Resistance Heat Exchangers
UNS N08904 Spiral Welded Stainless Steel Pipe Heat Exchangers Boiler Use
Bright Polish Stainless Steel Seamless Pipe With 347AP Austenitic Stainless
SS TP 202 Stainless Steel Pipe / 6-1000mm Out Diameter Stainless Steel ERW Pipe
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 1000 Tons |
Delivery Time | 5-8 working days | Packaging Details | Standard exported package |
Material Number | 1.0031 | Grade | E190 |
Standard | EN 10296-1: 2003 Welded circular steel tubes | Standard 2 | EN 10305-3: 2002 Steel tubes |
Brand Name | Globa Alloy | Model Number | 4inch Sch40 |
Certification | API, CE, ISO , PED | Place of Origin | China |
High Light | coated steel tube ,epoxy coated gas pipe |
What's the 1.0031 Steel with E190 Non-Alloy Quality Steel specification, 1.0031 Steel with E190 Non-Alloy Quality Steel chemistry, 1.0031 Steel with E190 Non-Alloy Quality Steel equivalent, 1.0031 Steel with E190 Non-Alloy Quality Steel Mechanical Properties? 1.0031 Steel with E190 Non-Alloy Quality Steel manufacturer in China.
1.0031 Steel with E190 Non-Alloy Quality Steel
Grade : | E190 | |||
Number: | 1.0031 | |||
Classification: | Non-alloy quality steel | |||
Standard: |
|
1.0031 Steel with E190 Non-Alloy Quality Steel
C | Si | Mn | P | S |
max 0.1 | max 0.35 | max 0.7 | max 0.045 | max 0.045 |
Rm - Tensile strength (MPa) (+CR) | 270 |
ReH - Minimum yield strength (MPa) (+CR) | 190 |
A - Min. elongation at fracture (%) longitud., (+CR) | 26 |
A - Min. elongation at fracture (%) transverse, (+CR) | 24 |
1.0031 Steel with E190 Non-Alloy Quality Steel
MIDDLE EAST Country | Deliver Days | Port Name |
Malaysia E190 Non-Alloy Quality Steel | 10 - 20 Days | Port of Klang, Malaysia - Penang Port, Malaysia |
Singapore E190 Non-Alloy Quality Steel | 10 - 20 Days | Northport , Malaysia - Westports, Malaysia |
Thailand E190 Non-Alloy Quality Steel | 20-30 Days | Port of Laem Chabang, Thailand |
Philippines E190 Non-Alloy Quality Steel | 20-30 Days | Port of Manila - Port of Jordan, Philippines |
Indonesia E190 Non-Alloy Quality Steel | 25-40 Days | Jakarta Tanjung Priok Seaport indonesia |
Sri Lanka E190 Non-Alloy Quality Steel | 10-15 Days | Port of Colombo |
Bangladesh 1.0031 Steel | 5-10 Days | The Port of Chittagong (Bangladesh) |
UAE 1.0031 Steel | 5-10 Days | Port of Mina Jebel Ali (Jebel Ali - Dubai ) , United Arab Emirates & Port Zayed (Mina Zayed), United Arab Emirates |
Saudi Arabia 1.0031 Steel | 10-20 Days | Jeddah Islamic Port, Saudi Arabia |
Turkey 1.0031 Steel | 20-30 Days | Haydarpasa, Izmir and Mersin Port - Port of Ambarli, Turkey |
Qatar 1.0031 Steel | 8 - 12 Days | Port of Doha, Qatar & Port of Al Wakrah, Qatar |
Oman 1.0031 Steel | 5 - 10 Days | Port Of Sohar - Oman , Port of Muscat - Oman |
Kuwait 1.0031 Steel | 8 - 15 Days | Port of Kuwait, Kuwait |
Yemen 1.0031 Steel | 8 - 15 Days | Port of Aden, Yemen |
Jordan 1.0031 Steel | 15 - 20 Days | Port of Aqaba, Jordan |
Cyprus 1.0031 Steel | 16 - 20 Days | Famagusta Port, Cyprus |
AFRICAN Countries Port | Deliver Days | Port Name |
Nigeria 1.0031 Steel | 35 - 40 days | Tin Can Island Port Complex, Nigeria |
Algeria boiler Steel Tubes | 35 - 40 days | Port of Alger, Algeria - Port of Bejaia, Algeria - Port of oran, Algeria - Port of ghazaouet, Algeria |
Angola | 35 - 40 days | Port of Luanda, Angola |
South Africa | 20 - 30 days | Port Elizabeth, South Africa |
Libya | 18 - 20 | Port of Benghazi, Libya |
Egypt | 15 - 20 Days | Port of Damietta, Egypt |
Sudan | 10-15 Days | Port of Sudan, Sudan |
Equatorial Guinea | 35 - 40 days | Port of Malabo, Equatorial Guinea - Port of Bata, Equatorial Guinea |
The Republic Of Congo | 35 - 40 days | Port of Matadi, Congo - Kinshasa |
Gabon | 35 - 40 days | Port of Owendo, Gabon |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller,Other
Year Established:
2010
Total Annual:
1000000-5000000
Employee Number:
116~209
Ecer Certification:
Site Member
Best Alloy Engineering Alloy Pipe as s a reference point for excellence in the manufacture and distribution of fittings, piping, bends, forged flanges , clad products and specialties for the upstream, midstream and downstream sectors of oil & gas, thermal and ... Best Alloy Engineering Alloy Pipe as s a reference point for excellence in the manufacture and distribution of fittings, piping, bends, forged flanges , clad products and specialties for the upstream, midstream and downstream sectors of oil & gas, thermal and ...
Get in touch with us
Leave a Message, we will call you back quickly!