Sign In | Join Free | My ismap.com
ismap.com
Products
Search by Category
Wholesale Marketplace
Home > Metal Slabs >

Nonstandard Floor Slab Formwork System with Simple Structure , Flexible Location

Categories Slab Formwork System
Model Number: Floor formwork
Place of Origin: Beijing, China (Mainland)
Brand Name: ZULIN
Certification: ISO9001-2008
Price: Negotiation
MOQ: One 20ft container
Delivery Time: After deposit 15-20 days
Payment Terms: T/T L/C (bank transfer)
Supply Ability: 100sets/day
Packaging Details: In bulk,pallet,bundle or according the customer demand
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    Nonstandard Floor Slab Formwork System with Simple Structure , Flexible Location


    Nonstandard Floor Slab Formwork System with Simple Structure , Flexible Location


    Descrition:


    Product Name:Nonstandard Slab Formwork


    Nonstandard slab formwork is widely used in concrete pouring of slabs. Floor props or scaffoldings with

    supporting heads are the supporting system. The main beam and secondary beam are timber beams with

    plywood on the topside. The system has many advantages, such as simple structure, easy assembly and

    dismantling, flexible location and being able to reuse.



    The supporting head series

    In concrete pouring of the slabs, supporting head series support the slab formwork. Some of them can

    move early or quickly. Subject to the demand, various kinds of supporting heads are able to work together,

    thus making construction work much more efficient.





    The Sketches

    Cross head

    U-head


    Early striking ring head assembly

    Early striking head

    Lowering head


    Early Striking Head Disassembly Progress







    After concreting,

    hit the pin plate to let it move.



    When the pin plate

    move to the right position,

    the movable part of the

    head and main beam will come down.

    Remove the main

    beam for reuse.



    Lowering head Disassembly Progress


    After the concrete pouring,

    hit the pin plate to let it move.




    When the pin plate

    move to the right position,

    the main beam, secondary

    beam and plywood

    will come down in order.



    Remove the timber beams,

    plywood, lowering heads

    and floor props.



    Quality Nonstandard Floor Slab Formwork System with Simple Structure , Flexible Location for sale
    Send your message to this supplier
     
    From:
    To: Beijing Zulin Formwork & Scaffolding Co., Ltd.
    Subject:
    Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0